wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Disaster Management - Revision

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Name the diagram

a)

Disaster Management Cycle

b)

Disaster Response Cycle

c)

Disaster Prevention Cycle

d)

Disaster Reduce Cycle

2.

This type of activities will be carried out by which team

a)

NSRF

b)

NDRF

c)

NSS

d)

NCC

3.

On which day it is observed?

a)

Nov 13

b)

Jan 13

c)

Oct 13

d)

Feb 13

4.

The indication red colour is

a)

Hazard

b)

Risk

c)

Measure

d)

Mitigation

5.

This symbol denotes

a)

Flammable liquids

b)

Quarantine

c)

Curve roads

d)

Toxicity

6.

These symbols indicating

a)

Hazards

b)

Vulnerability

c)

Risk

d)

Disaster

7.

The role of this activity is mandatory in

a)

Pre disaster

b)

Post disaster

c)

Re disaster

d)

Pro disaster

8.

This indicates

a)

Crop insurance

b)

Raised water level

c)

Flood insurance

d)

Tsunami indication

9.

This picture indicates

a)

Industry zoning

b)

Green zoning

c)

Building zoning

d)

Flood zoning

10.

This situation indicates

a)

Flood

b)

drought

c)

epidemic

d)

urbanization