WorksheetsQUIZ 1- L4: C03 (SYSTEM INSTALLATION & COMMISSIONING)
Total questions: 12
Worksheet time: 6mins
What is the number code of subject that you learn right now?
C01
C02
C03
C04
C05
What is the competency title of C03?
Industrial automation system design
Industrial automation system maintenance coordination
Industrial automation system integration
Industrial automation system installation and commissioning
DEFINITION OF INSTALLATION -
THE PROCESS ENSURES THAT ALL INDUSTRIAL SYSTEMS AND COMPONENTS ARE DESIGNED, INSTALLED, TESTED, OPERATED, AND MAINTAINED ACCORDING TO THE OPERATING NEEDS OF THE OWNER OR END CUSTOMER.
TRUE
FALSE
Which listed IS NOT advantages of pre-installation?
Able to customize the site
Add additional cost
Able to make proper planning
Able to streamline installation process
What is the purpose of pre-installation?
early preparation before real installation
able to add additional cost
delay the installation process
Pre-installation site check and pre-installation equipment check are the types of pre-installation.
TRUE
FALSE
All listed below are the main aspect in pre-installation site visit EXCEPT...
Pre-audit and confirmation
Pre-installation on site
Location and route of transportation
Full equipment information
Roads are narrow, an unstable bridge on the way, overhead barriers, the transportation system and the traffic jam.
What is the meaning of listed items?
Installation site
Delivery equipment
Audit practice and validation
Infrastructure in location and route transportation.
What is the name of tools for lifting and transmission?
Forklift
Forklift jack
Slider
Wheel roller
What is the readiness required for pre-installation on site?
Installation approval permit
Moving equipment - forklift jack, wheel roller
Soil stability.
Process flow
In audit practice and validation, what you should do to make sure all the things you need to check and take action are success.
Prepare bill of materials
Prepare gantt chart
Prepare pre-installation checklist
Prepare plant layout
WHAT IS THE MEANING OF COMMISSIONING?
THE ACT OF INSTALLING, INSTALLATION PROCESS OF MACHINE, SERVICES AND ETC, READY FOR USE IN CERTAIN PLACE
THE PROCESS ENSURES THAT ALL INDUSTRIAL SYSTEMS AND COMPONENTS ARE DESIGNED, INSTALLED, TESTED, OPERATED, AND MAINTAINED ACCORDING TO THE OPERATING NEEDS OF THE OWNER OR END CUSTOMER
PROCESS OF VISIT TO THE INSTALLATION SITE BEFORE THE INSTALLATION PROCESS RUNS
THE SYSTEM IS SUBJECT TO EXPANSION / IMPROVEMENT, MODIFICATION OR RESTRUCTURING