QUIZ 1- L4: C03 (SYSTEM INSTALLATION & COMMISSIONING)

Total questions: 12

Worksheet time: 6mins

Name
Class
Date
1.

What is the number code of subject that you learn right now?

a)

C01

b)

C02

c)

C03

d)

C04

e)

C05

2.

What is the competency title of C03?

a)

Industrial automation system design

b)

Industrial automation system maintenance coordination

c)

Industrial automation system integration

d)

Industrial automation system installation and commissioning

3.

DEFINITION OF INSTALLATION -

THE PROCESS ENSURES THAT ALL INDUSTRIAL SYSTEMS AND COMPONENTS ARE DESIGNED, INSTALLED, TESTED, OPERATED, AND MAINTAINED ACCORDING TO THE OPERATING NEEDS OF THE OWNER OR END CUSTOMER.

a)

TRUE

b)

FALSE

4.

Which listed IS NOT advantages of pre-installation?

a)

Able to customize the site

b)

Add additional cost

c)

Able to make proper planning

d)

Able to streamline installation process

5.

What is the purpose of pre-installation?

a)

early preparation before real installation

b)

able to add additional cost

c)

delay the installation process

6.

Pre-installation site check and pre-installation equipment check are the types of pre-installation.

a)

TRUE

b)

FALSE

7.

All listed below are the main aspect in pre-installation site visit EXCEPT...

a)

Pre-audit and confirmation

b)

Pre-installation on site

c)

Location and route of transportation

d)

Full equipment information

8.

Roads are narrow, an unstable bridge on the way, overhead barriers, the transportation system and the traffic jam.


What is the meaning of listed items?

a)

Installation site

b)

Delivery equipment

c)

Audit practice and validation

d)

Infrastructure in location and route transportation.

9.

What is the name of tools for lifting and transmission?

a)

Forklift

b)

Forklift jack

c)

Slider

d)

Wheel roller

10.

What is the readiness required for pre-installation on site?

a)

Installation approval permit

b)

Moving equipment - forklift jack, wheel roller

c)

Soil stability.

d)

Process flow

11.

In audit practice and validation, what you should do to make sure all the things you need to check and take action are success.

a)

Prepare bill of materials

b)

Prepare gantt chart

c)

Prepare pre-installation checklist

d)

Prepare plant layout

12.

WHAT IS THE MEANING OF COMMISSIONING?

a)

THE ACT OF INSTALLING, INSTALLATION PROCESS OF MACHINE, SERVICES AND ETC, READY FOR USE IN CERTAIN PLACE

b)

THE PROCESS ENSURES THAT ALL INDUSTRIAL SYSTEMS AND COMPONENTS ARE DESIGNED, INSTALLED, TESTED, OPERATED, AND MAINTAINED ACCORDING TO THE OPERATING NEEDS OF THE OWNER OR END CUSTOMER

c)

PROCESS OF VISIT TO THE INSTALLATION SITE BEFORE THE INSTALLATION PROCESS RUNS

d)

THE SYSTEM IS SUBJECT TO EXPANSION / IMPROVEMENT, MODIFICATION OR RESTRUCTURING