Font size
WorksheetsBuilding Services - AC
Total questions: 10
Worksheet time: 5mins
Package Unit Air Conditioning System is most suitable for ____________ buildings.
medium sized
large
small
highrise
Name ONE of the two methods of removing indoor heat for a package unit system.
(a)
How is the conditioned air distributed into the rooms?
Through the pipes
Through the ducting system
Through the filters
Through the refrigerant
Which of the following are the main components in plant system? You can select more than once.
AHU
Water tank
Refrigerant plant
Cooling tower
Which of the following is FALSE about the air handling unit?
It will located at every floor of the building.
It received the treated air from the refrigeration plant.
It treats the air using the air-cooled method.
The damper inside the AHU helps to absorb the noise.
How is the heat removed from the cooling tower?
(a)
What is the most sophisticated and largest type of air conditioning system for buildings?
(a)
How can we make air conditioning more energy efficient? You can select more than once.
Retrofitting
Proper insulation
Regular maintenance
Add more floor area in the building
The distribution and piping network for the district cooling system is laid (a) .
What would be the most suitable air conditioning system for the Petronas Twin Towers and Suria Shopping Complex?
