WorksheetsProf Prac 2 (Credits to Reviewer 2015)
Total questions: 41
Worksheet time: 41mins
Who is responsible the fee of additional full-time supervisor in the project?
Project Manager
Construction Manager
Owner
Architect
As per 2010 SPP, how many sets of plans are to be given/submitted to the owner?
5
6
7
8
PRC stands for?
Philippine Regulation Commission
Philippine Regulatory Commission
Professional Regulatory Board
Professional Regulation Commission
What do you call working drawings, specifications, estimates, and general conditions?
Construction drawings
Contract documents
Project manual
Project requirements
An architect refuses to give the original plan to the owner. Why?
The owner is entitled only to the blueprint.
The architect's work is covered by intellectual property rights / law.
In order to prevent the owner from making duplicates and/or constructing without his knowledge.
All of the above.
You had a residential project for a client. The construction did not push through because unfortunately the client died. The brother of the client who had a similar lot at the same subdivision decided to use the same plans for the construction of his house. What will you do?
Forgive and forget.
Inform the mayor.
File a case with the PRC.
File a case in court.
Before submitting sketches to a client, what must the architect first do?
Sign a service agreement.
Bill for downpayment.
Discuss board for presentation.
Prepare the probable construction cost.
A person found preparing architectural plans without the necessary license is guilty of what?
Misdemeanor
Illegal practice
Malpractice
Misrepresentation
The PRC will not issue the Certificate of Registration to a successful examinee if he commits one of the following:
Sign his signature in a project that he didn't design.
Fraudulent act
Unethical practice by competing with other architect
Immoral act
What offense is committed when an architect is found using the seal of another architect?
Misdemeanor
Illegal practice
Malpractice
Misrepresentation
If an architect wants to register a "single proprietorship" firm, where will he register?
DTI and SEC
DTI and PRC
SEC and PRC
DTI, SEC, and PRC
A Japanese student studying architecture in the Philippines would like to undertake the architectural board exam. In what condition is he allowed to take the exam?
He cannot take the exam since he is not a Filipino citizen.
He should at least stayed for ten years in the Philippines.
His high school curriculum should be compared/checked to see if his education abroad is similar to that of the Philippines.
Reciprocity
Aside from the people and country, who does the architect give supreme oath to?
Client
Contractors
God
Colleagues
A 5th year architecture student is commissioned by a couple to design a house. The student had the plans signed by his architect professor. Who is unethical?
Professor
Student
Couple
Both professor and student
A recent graduate of a BS in Architecture course is asked and contacted by his aunt who financed his studies to design a 2-storey residence for her. After the graduate finished preparing all the architectural plans, he asked his former professor to sign and seal it. The professor agrees to do it for a sum of Php 6k. Is there anything wrong with this practice?
No, since the professor has agreed anyway.
Yes, because he is not yet capable of preparing plans.
No, since he is only returning the favor.
Yes, because the preparation was not supervised by the professor.
What is the foremost role of an architect with regards to this client?
Employee
Mediator
Adviser
Design consultant
A very discreet client has chosen you as the architect of his new project. Midway through the design phase, another architect has claimed that he was the rightful designer of the project and he was being consulted by the clients long before your agreement with the said client has taken place. Knowing about the discreet nature of the client, what should you do to settle this dispute?
Suspend the project immediately and let the owner settle his matter with the former architect.
Continue the project; ignore the other architect without giving another thought.
Continue the project but help the owner in settlement with the third party.
Suspend the project help the owner settle with the third party first.
Under what plan will you find the sprinkler, smoke proof, etc.?
Fire Safety Plan
Fire Protection Plan
Mechanical Plan
Sanitary Plan
The owner likes a particular bidder. The bidder is delayed and fails to beat the deadline. What factors can be considered so that he can still join the bid?
Reschedule bidding
Declare failure of bidding
Continue bidding but declare no winner
Nothing
If the owner wants to change the estimated cost after awarding to a winning bidder due to economic basis, what should he do?
Change architect.
Revise scope of contract.
Change order.
Organize another bidding.
When should a Building Operations Manual (BOM) be submitted to the owner by the contractor?
30 days after issuance of Certificate of Occupancy
As soon as the owner asks for it and all billings paid
As soon as the building is finished and ready for occupancy
Before final payment is made
In what instance do several architects submit design proposals at the same time?
Referral
Direct hiring
Comparative selection
Design competition
Stage in comparative selection where architects and/or PRC-registered architectural firms (AFs) submit information regarding their qualification and expertise
Pre-qualification
Negotiation
Verification
Evaluation and ranking
In comparative selection, the client issues an invitation which includes the _______ for the project which is based on the design brief prepared by another architect.
Organizational structure
Architectural program
Terms of reference
Tender documents
These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the client in early decision-making.
Feasibility studies
Pre-feasibility studies
Architectural research
Architectural programming
This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs. The goal is to achieve an unimpaired program at minimum cost.
Construction management
Project management
PERT-CPM
Value management
Under this service, the architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private).
Design brief preparation
Promotional services
Architectural programming
Space management studies
For pre-design services, the architect can render services in any of the following ways except for
As an individual architect
Architect's own staff
Sub-contracting
By association, consultation or networking
The multiplier for Multiple of Direct Personnel Expenses ranges from 1.5 to 2.5 depending on the following except for
Office set-up and overhead
Experience of the architect
Complexity of the project
Professional status of the architect
For these particular activities, the architect as agent of the owner may be paid on a per diem and honorarium basis plus out-of-pocket expenses such as but not limited to travel, accommodations, and subsistence except for:
Attending project-related meetings, conferences, or trips
Long-distance phone calls, internet connections and communications
Conducting ocular inspection of possible project sites
Conferring with others regarding prospective investments or ventures and the like
A foreign architect practicing architecture in the Philippines for projects on Philippine soil must first secure a ____________ and a work permit from the Department of Labor and Employment (DoLE) and must work in collaboration with a local counterpart architect who is a registered and licensed architect (RLA) under Philippine law.
Foreigner's professional liability insurance
Temporary / special permit
Foreign practice permit
Foreign professional permit
Under project definition phase, the architect:
Consults with the owner to ascertain the conceptual framework and related requirements the project and confirms such requirements with him
Gathers relevant information and data leading to the definition of the requirements of the project, including the scope of the architect's services
Reviews and refines the owner's space requirements and translates them into an architectural program
Prepares an initial statement of probable construction cost
For competitive bids / procurements, the architect furnishes complete sets of the bid documents purposes of bidding in as many sets as may be required to conduct a successful bidding. What happens to the documents once the bidding is completed?
Retained by the bidders since they have paid the cost for these
Returned to the architect since they are the intellectual property of the architect
Retained by the bidders for future reference
Returned to the client since are the property of the client
Under Regular Design Services, reimbursable expenses include transportation, housing and living allowance of consultant, transportation, per diem, housing, and living allowance of local consultants and technical staff if assigned to places over ______ km. from area of operation of the architect.
50
100
150
200
This method of compensation is frequently used where there is continuing relationship involving a series of projects. It establishes a fixed sum over and above the reimbursement for the architect's technical time and overhead.
Discounted rate
Professional fee + expenses
Lump sum or fixed fee
Per diem
A per diem plus traveling and living expenses shall be chargeable to the owner whenever the architect or his duly authorized representative is required to perform services at a locality beyond ____ kilometers (air, straight line, or radial distance) from his established office as it appears in the architect's letterhead.
50
100
150
200
When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive as compensation the sum corresponding to ____ of the architect's fee.
85%
90%
95%
65%
If portions of the building/s are erected at different periods of time, thus increasing the construction period and architect's burden of services, charges pertaining to services rendered during the construction phase shall be adjusted proportionately. When the suspension of construction exceeds a period of ____ months, the fee for the remaining works shall be doubled.
3
6
9
10
The cost of materials used and the labor for their installation are part of the project construction cost. If these items are furnished by the owner below its market cost, how will the cost of the material and labor be occupied?
Based on acquisition cost
Based on current fair market value
Based on estimate of the architect
Based on contractor's bid
Refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way (ROWs), open spaces and activity spaces are to be proposed.
Urban design
Urban planning
Physical planning
Site development planning
The architect in this area of practice recommends the systematic process of ensuring that a building/structure's array of systems is planned, designed, installed, and tested to perform according to the design intent and the building's operational needs
Building Environment Certification
Building Testing and Commissioning
Building Systems Design
Forensic Architecture