Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

TAR-10 Contractor HSE Forum

Total questions: 8

Worksheet time: 3mins

Name
Class
Date
1.

When is the start of TAR 10?

a)

10 october

b)

12 october

c)

1 october

d)

12 september

2.

What is the estimated POB for TAR-10?

a)

850

b)

1430

c)

1000

d)

2000

3.

What scope is not critical in TAR-10?

a)

Boiler modification

b)

Chiller swapping

c)

Dryer/Catalyst change-out

d)

Turbomachinery scope

4.

Which is the maximum age not allowed to go to site?

a)

45 years old

b)

50 years old

c)

55 years old

d)

>60 years old

5.

These are the differences between TAR-9 and TAR-10, except:

a)

Scope of work

b)

POB number

c)

Safe execution

d)

Covid-19 pandemic

6.

What are the challenges in TAR-10?

a)

Remote preparation

b)

Green helmet (new hire)

c)

New technology

d)

All answers are correct

7.

In which scope will use robotic technology?

a)

Turbomachinery

b)

Dryer/Catalyst change-out

c)

Chiller swapping

d)

AGI modification

8.

Which scope that need attention to Dry Gas Seal learning?

a)

Turbomachinery

b)

Dryer/Catalyst change-out

c)

Chiller swapping

d)

AGI modification