wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

RRR Study Guide

Total questions: 15

Worksheet time: 13mins

Name
Class
Date
1.

How many RRR Batch Processes does a case cycle through during the year?

a)

1

b)

3

c)

4

d)

2

2.

Which window in CalWIN will the EW need to review for any open Batch Exceptions and end date?

a)

Collect Case Special Indicators

b)

Collect Case Unspecial Indicators

c)

Collect Case Indicators

d)

Collect Case Information

3.

In CalFresh, if a recertification is untimely a HH loses its right to uninterrupted benefits if it failed without good cause to:

a)

File a timely certification

b)

Call the Call Center

c)

Complete an interview

d)

Speak to a SSPS

4.

What form is used to request verification for Medi-Cal?

a)

CW 2200

b)

MC 335

c)

CW 355

d)

MC 355

5.

To ensure that the Medi-Cal case does not discontinue in the future, the EW will need to disposition the MC 0216 report in CalWIN. This should be done prior to starting the (a)  

6.

When an MC RRR task is received the EW will complete an (a)   to determine if Non-MAGI HH members have linkage

7.

The CF form that is used to request additional information from the client is the?

a)

CW 2000

b)

CW 2200

c)

CW 2020

d)

CW 0002

8.

The Capture Discrepancy Information window in CalWIN allows the EW to do what?

a)

Run EDBC

b)

Deny Benefits

c)

Authorize Benefits

d)

Re-Evaluate Benefits

9.

In CalFresh, a recertification is considered to be timely under the following circumstances:

a)

File an application (return the application packet sent to them) no later than the 15th day of the month, if not completed during the interview

b)

Submit any required verification and signed application if sent out after the interview no later that 10 days from the interview. The interview must be scheduled to allow for the 10 days before the end of the certification period.

c)

Client calls to say hi!

d)

Recyclopse Attack!

10.

What are the 3 types of CalFresh certifications?

a)

Semi-Annual Reporting

b)

Transitional CalFresh

c)

24 Month Certification

d)

36 Month Certification

11.

To apply a Change in Circumstance in CalWIN, the EW will need to update which window?

a)

Collect Case Inquiry

b)

Collect Case Summary

c)

Collect Case Cases

d)

Collect Client Case

12.

What are the 3 Steps of the Ex Parte Review?

a)

Review all systems

b)

Make something up

c)

Call the client

d)

Request verification

13.

Give 3 Examples of corrected failures on discontinued cases that allows for CalFresh Delayed processing

4 lines
14.

The (a)   period begins the first day after the renewal end date for all cases that were discontinued for failure to provide missing verifications.

15.

When an RRR is completed, CalWIN assigns a new RRR Date and changes the status to?

a)

Complete

b)

Done

c)

Waiting

d)

Pending