Font size
WorksheetsQUANTITY SURVEYING II
Total questions: 23
Worksheet time: 25mins
Value of the property after dismantling.
Scrap value
Salvage value
Ratable value
Depreciation
Value of the property at the end of life time of a property?
Scrap value
Salvage value
Obsolescence
Depreciation
Value of the property gets decreased due to outdated design ,style is known as (a)
Periodic annual installments of sinking fund is termed as (a)
Process of determining the current worth of an asset or a company or a property is termed as (a)
What is the purpose of valuations? atleast any 3 give in answer.
(a)
Total amount of the in come received from the property during the year, without deducting outgoings is..........
Net income
Gross income
Outstanding income
Unratable income
Amount of the property which can be obtained at any particular time from open market is.....................
Capitalized value
Market value
Rateable value
Accommodation value
Net annual letting value of the property obtained after deducting amount of yearly repairs from gross income (a)
(a) is defined as the capital sum required to be invested in order to receive a net receive a net annual income as an annuity of rupee one at a fixed rate of interest.
Calculate the value of years purchase for a property if its life is 20 years and rate of interest is 5%. For sinking fund rate of interest is 4.5 %.
(a)
Loss of value of the property due to use,life,wear,tear is ............
Obsolesecnce
Depreciation
Decrease
Annual loss
Net income by way of rent is found out by deducting all outgoings from gross rent. A suitable rate of interest as prevailing in the market is assumed and year's purchase is calculated. ... the net profit is multiplied by Y.P to get the capitalized value.Name the method?
(a)
Gross rent = ..............................
Net rent - outgoings
Net rent + outgoings
Net rent x outgoings
Net rent / outgoings
Allotment for accommodation for residence of a government employee is taken as ....... of his basic pay.
1/15
1/10
1/20
1/5
Length of bent up bar = ..............................
length of bar + (2* hook length) - 0.9 D
length of bar + (2* hook length) + 0.9 D
length of bar - (2* hook length) - 0.9 D
length of bar + (2+ hook length) - 0.9 D
One side hook length for stirrups is .................................... (d= dia of bar)
20 d
24 d
10 d
12 d
Extra length for one side bent up in bent up bar..........
0.9 D
0.45 D
0.42 D
1.0 D
One side hook length for reinforcement bars.............
18 d
9 d
12 d
15 d
The topmost layer in WBM road is (a)
Find total cutting length of bar including hooks is (a)
Find total cutting length of bent up bar if D = 468 mm is (a)
Find the cutting length of stirrups if the diameter is 8 mm is (a) mm
