SCRUM MASTER (By Scrum.org)

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

Who is responsible for directing the Daily Scrum?

a)

The Scrum Master

b)

Product Owner

c)

The Developement Team

d)

The Developement Team & Scrum Master

2.

Upon what type of process control is Scrum based?

a)

Hybrid

b)

Complex

c)

Empirical

d)

Defined

3.

Which of the below are not ROLES on SCRUM TEAM?

a)

Product Owner

b)

Project Manager

c)

Stakeholders

d)

Development team

e)

Scum Master

4.

Which of the following is a correct statement?

a)

The Scrum Master leads the daily scrum

b)

The Scrum Master can cancel the sprint

c)

The Scrum Master is not a management position

d)

None of the above

5.

Which of the following is NOT an empirical process control pillar?

a)

Inspection

b)

Transparency

c)

Productivity

d)

Adaptation

6.

When is a Sprint over?

a)

When all Product Backlog items meet their definition of done

b)

When all the tasks are completed

c)

When the timebox expires

d)

When the Product Owner says it is done

7.

The CEO asks the Development Team to add a "very important" item to the current Sprint. What should the Development Team do?

a)

Inform the Product Owner so he/she can work with the CEO

b)

Add the item to the next Sprint

c)

Add the item to the current Sprint without any adjustments.

d)

Add the item to the current Sprint and drop an item of equal size.

8.

Who is responsible for managing the progress of Work during a Sprint?

a)

The Scrum Master

b)

The Development team

c)

The Product Owner

d)

The most junior member of the team

9.

The Scrum Team should choose at least one high priority process improvement, identified during the Sprint Retrospective, and place it in the Product Backlog.

a)

True

b)

False

10.

The product backlog is ordered by:

a)

Least valuable items at the top to most valuable at the bottom

b)

Size, where small items are at the top and large items are at the bottom

c)

Risk, where safer items are at the top, and riskier items are at the bottom

d)

Whatever is deemed most appropriate by the Product Owner

11.

Which statement best describes a Product Owner's responsibility?

a)

Keep stakeholders from distracting the Development Team

b)

Managing the project and ensuring that the work meets the commitments to the stakeholders

c)

Optimizing the value of the work the Development Team does

d)

Directing the Development Team

12.

Who collaborates during the Product Backlog Refinement?

a)

The Product Owner & Scrum Master

b)

The Product Owner & Development team

c)

the Scrum Master & Development team

d)

The Product Owner, Scrum Master & Development team

13.

When might a Sprint be abnormally cancelled?

a)

When the Sprint Goal becomes obsolete

b)

A Sprint could never be cancelled

c)

When the Development Team feels that the work is too hard

d)

When it becomes clear that not everything will be finished by the end of the Sprint

14.

The maximum length (time-box) of the Sprint Review is:

a)

As long as needed

b)

1 hours per week in a month sprint

c)

2 hours per week in a month sprint

d)

6 hours for a 4 weeks sprint

15.

Which could be the closest definition of "done"?

a)

A common understanding when work is complete

b)

The Increment acceptance of the Stakeholder

c)

Successful execution of a test

d)

A common understanding when work is complete on the product increment