wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Quiz on Hydroelectricity

Total questions: 15

Worksheet time: 3mins

Name
Class
Date
1.

Electricity generated from the energy of falling water (potential energy of water) is called hydroelectricity.

a)

True

b)

False

2.

Hydroelectric power plant can be located at

a)

canals

b)

rivers

c)

dams

d)

kitchens

3.

Which country is the global leader in hydroelectricity/hydropower generation?

a)

China

b)

United States of America

c)

Canada

d)

Brazil

4.

In hydroelectricity plant, the potential energy of water is converted into (a)   energy.

5.

The power generated from hydroelectric plan depends on:

a)

volumetric flowrate of water

b)

height of the fall of water

c)

wave of water

d)

colour of water

6.

The power generated from hydroelectric plan depends on:

a)

volumetric flowrate of water

b)

height of the fall of water

c)

wave of water

d)

colour of water

7.

In pumped storage system, water is pumped from lower reservoir to a higher reservoir during peak period when the electricity demand is high.

a)

True

b)

False

8.

Construction of large scale hydroelectricity plant can cause forced resettlement of people at the identified site.

a)

True

b)

False

9.

Hydropower produces ________ during its operation of electricity generation .

a)

zero waste

b)

minimal waste

c)

a lot of waste

d)

a lot of pollution

10.

Electric generator is also called as

(a)  

11.

The electricity obtained from the energy possessed by is called hydro-electricity.

(a)  

12.

Choose the parts in the production of Hydroelectricity

a)

Water turbine

b)

Motor

c)

Dynamo

d)

Rudder

e)

Shaft

13.

Where is the world's most powerful production of Hydroelectricity

a)

Brazil

b)

Australia

c)

China

d)

Africa

14.

The main part in production of Hydroelectricity is

(a)  

15.

The energy of water can be converted into electrical energy

a)

True

b)

False