wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PLC TEST

Total questions: 45

Worksheet time: 15mins

Name
Class
Date
1.
PLC has replaced__________
a)
Transistor
b)
Computer
c)
Relay Logic
d)
Solenoid
2.
Disadvantage of PLC is _________
a)
Security
b)
Documentation
c)
Fixed program application
d)
Pilot running
3.
PLC stands for_______
a)
Programmable Ladder Controller
b)
Program Low Controller
c)
Programmable Logic Controller
d)
Programmable Logic Converter
4.
If the I/O Count of PLC is between 32 to 128 then it is called as ___________.
a)
Micro PLCs
b)
Medium PLCs
c)
Small PLCs
d)
Large PLCs
5.
Output modules are available in various switching and _______configurations.
a)
AC
b)
DC
c)
Relay
d)
Transistor
6.
The devices connected to PLC for sending status information are called _______field devices.
a)
Programmer and monitoring
b)
Memory
c)
Output
d)
Input
7.
Hand held terminals is an example for___________.
a)
CPU
b)
Input Module
c)
output Module
d)
Programmer and monitoring
8.
In PLC the user program is stored in ________ memory.
a)
ROM
b)
PROM
c)
EPROM
d)
EEPROM
9.
Input modules provide an interface between ______________and_____________.
a)
Input connections and the CPU
b)
Field equipment and the CPU
c)
Output modules and field devices
d)
The CPU and output modules
10.
PLC I/O systems provides an interface between __________ and ___________.
a)
Input devices and the CPU
b)
Field equipment and the CPU
c)
Output modules and field devices
d)
Input modules and output modules
11.
Electrical isolation is provided so that there is no physical electrical connection between the CPU and output field devices. This isolation is usually accomplished by____________
a)
Power supply
b)
Rectifier
c)
Opto coupler
d)
Holding Register
12.
1KB of memory is equal to ________
a)
1000 bits
b)
1000 words
c)
1024 bytes
d)
1024 words
13.
Power signal that the output module switches to control field devices must be provided by__________
a)
The CPU
b)
The user
c)
The master control relay
d)
Relay
14.
A _____ is usually mounted on one end of each rack, backplane, or chassis.
a)
CPU
b)
single power supply
c)
memory card
d)
I/O Card
15.
The programming device must be connected ____________ to the controller
a)
At all times
b)
When entering a programme
c)
When monitoring a programme
d)
When entering or monitoring a programme
16.
The basic difference between plc and relay control system is ___________
a)
Different input and output voltage levels are used
b)
Different types of output devices are used
c)
Different types of input devices are used
d)
One uses relay control logic & other uses programmed instructions
17.
The abbreviations NO and NC represents the electrical state of switch contacts when_______________.
a)
Power is applied
b)
Power is not applied
c)
The switch is actuated
d)
The switch is not actuated
18.
NC push button connected in hardware & NC contact in software then the coil connected to the NC contact will be ___________
a)
ON
b)
OFF
c)
Short
d)
Toggle
19.
A limit switch is usually actuated by_________.
a)
Hand
b)
Pressure
c)
Contact with an object
d)
An electromagnet
20.
A thermocouple ,when heated _______
a)
Produces a small dc voltage
b)
Increases its resistance value
c)
Produces a small AC voltage
d)
Decreases its resistance value
21.
A________converts electrical pulses applied to it into discrete rotor movement
a)
Tachometer
b)
Solenoid
c)
Stepper motor
d)
Electronic magnetic flow meter
22.
Digital I/O modules operate on___________
a)
24V AC supply
b)
24V DC supply
c)
5V AC supply
d)
12V DC supply
23.
PNP type proximity sensor is compatible with __________ input module.
a)
Sourcing
b)
Sinking
c)
AC
d)
DC
24.
NPN type proximity sensor is compatible with __________ input module
a)
sourcing
b)
sinking
c)
AC
d)
DC
25.
Discrete input modules accept signals from field devices that are________
a)
Analog type
b)
Digital Type
c)
Two-state Type
d)
Digital or Two state type
26.
A discrete input signal is considered valid if the signal is________
a)
Is a two-state signal
b)
Is successfully change from AC to DC through the bridge rectifier
c)
For an AC signal, if it is between 80 & 132 VAC
d)
If it is continous
27.
Thumbwheels switches provide input to the PLC in _______ format
a)
BCD
b)
Binary
c)
DECIMAL
d)
Hexadecimal
28.
Discrete output interface modules send signals to field devices that are__________
a)
Digital devices
b)
Analog devices
c)
Two-state devices
d)
Digital or Two state Device
29.
Discrete output modules act as a _________ to control output field devices
a)
Relay
b)
Switch
c)
Contactor
d)
solenoid
30.
Typical discrete output devices include_______
a)
Servo Motor
b)
Inductive proximity switches
c)
Solenoids
d)
LVDT
31.
Changing signals like temperature control or the 4 to 20-milliamp-speed reference for a variable-frequency drive are called ______ signals
a)
analog input
b)
digital input
c)
analog output
d)
digital output
32.
Suppose you need to select a module to interface AC or DC, two-state, ON/OFF, or OPEN/CLOSED incoming signals.which will you choose
a)
analog input module
b)
analog output module
c)
discrete input module
d)
combination of Analog and discrete input module
33.
Suppose you need to select a module to inter face out going AC or DC,two state, ON/OFF, or OPEN/CLOSED outgoing signals.Which will you choose
a)
discrete output module
b)
analog output module
c)
discrete input module
d)
Analog input module
34.
Suppose you need to select a module to interface a continuously changing incoming voltage or current signal.which will you choose
a)
analog input module
b)
analog output module
c)
discrete input module
d)
combination of Analog and discrete input module
35.
A discrete input module which can be interfaced is ___________
a)
push buttons
b)
Horn
c)
contactor
d)
Pilot lamp
36.
Volatile memory is__________
a)
RAM
b)
ROM
c)
PROM
d)
EEPROM
37.
Nonvolatile memory is________
a)
RAM
b)
ROM
c)
PROM
d)
EEPROM
38.
The processor in any PLC is designed to perform specific duties in a specific sequence and then continuously repeat the sequence.The operating cycle is called __________
a)
Access time
b)
Operating system
c)
Scan Cycle
d)
scan time
39.
The scan consists of a series of sequential operations which include, Reading________, program execution, data output
a)
connection
b)
Input
c)
Output
d)
Tie point
40.
If the input devices change its state while the processor is in program scan or output scan of the scan cycle then the plc will _____________
a)
Immediately react to them
b)
React during the next scan cycle
c)
Response very slow
d)
Does not react to them
41.
If two NC contacts are connected in series that satisfies _______Gate logic
a)
AND
b)
NAND
c)
OR
d)
NOR
42.
NC contact can be used to satisfy ________gate condition.
a)
NOT
b)
OR
c)
AND
d)
NOR
43.
If two NO contacts are connected in series that satisfies _______Gate logic.
a)
OR
b)
NAND
c)
NOR
d)
AND
44.
If two NC contacts are connected in parallel that satisfies _______Gate logic.
a)
AND
b)
NAND
c)
OR
d)
NOR
45.
The logical OR function is similar to connecting two NO contacts in _____________
a)
parallel
b)
series
c)
Direct reversal
d)
Indirect reversal