BUILD-UP RATE

Total questions: 15

Worksheet time: 6mins

Name
Class
Date
1.

The following are the cost to be considered during preparing build-up rate price rate EXCEPT

a)

Material Cost

b)

Labour Cost

c)

Profit and Overhead Cost

d)

Wastage

2.

Factors to be considered during making decision in renting or purchasing plant are

i. cost of renting or purchasing and depreciation value

ii. cost in repairing and replacing the damage plant

iii. fuel cost like petrol, diesel, hydraulic oil and grease

iv. fee for operator and labour to handle the machinery

a)

i and ii

b)

ii and iii

c)

ii, iii and iv

d)

i, ii, iii and iv

3.

How many bags of cement required for 1m3 of Cement

a)

18.7

b)

28

c)

29

d)

30

4.

Materials cost for Grade 20 (1:2:4) Concrete

Cement/bag : RM 18.50

Sand/m3 : RM 21.00

Aggregate/m3 : RM 38.00


Calculate the cost of cement to produce 7m3 of concrete.

a)

RM 499.50

b)

RM 508.75

c)

RM 518.00

d)

RM 527.50

5.

Materials cost for Grade 20 (1:2:4) Concrete

Cement/bag : RM 18.50

Sand/m3 : RM 21.00

Aggregate/m3 : RM 38.00

Calculate the total material cost for 1m3 of concrete. Ignore the shrinkage and wastage.

a)

RM 77.50

b)

RM 212.50

c)

RM 712.00

d)

RM RM 1,068.00

6.

The following are the works done by skilled labour EXCEPT

a)

bricklaying

b)

cutting and bending reinforcement

c)

operating machinery

d)

removing, replacing and compacting concrete

7.

These items are included in calculating price rate for reinforcement works.

i. Material Cost

ii. Labour Cost

iii. Maintenance Cost

iv. Plant and machinery cost

a)

i and ii

b)

i, ii and iii

c)

i, ii, iii and iv

d)

iv only

8.

Overhead costs refer to all indirect expenses of running a business. The following are the type of overhead cost expenses EXCEPT

a)

Salaries and wages

b)

Purchasing machinery

c)

Office Rental

d)

Utilities

9.

The percentage of wastage and shrinkage of the concrete works is

a)

20%

b)

25%

c)

33.33%

d)

50%

10.

Brick cost - RM0.60/pcs

Mortar cost - RM130/m3


Calculate the material cost per m2 for one brickwork in common bricks in cement mortar (1:3) in English bond.

a)

RM 41.05

b)

RM 78.25

c)

RM 81.50

d)

RM 84.75

11.

The bulking factor is the ratio or percentage of the volume change of excavated material to the volume of the original in situ volume before excavation. The following are the % of bulking after excavation of soil EXCEPT

a)

Ordinary soil - 25%

b)

Clay - 20%

c)

Sand - 10%

d)

Top Soil - 15%

12.

Excavation trench to foundation starting from reduced level maximum depth not exceeding 1.00 metre.

Given:

Labour output - 4.5 hour/m3

Labour wages - RM55/day

Type of soil - clay

Profit & overhead - 15%


Choose all correct answer.

a)

Labour Cost for excavation - RM16.88

b)

Labor wages /hour - RM6.88

c)

Multiplying factor for soil - 1.50

13.

Factors influencing equipment selection. Choose all correct answer.

a)

Site conditions

b)

The nature of works

c)

equipment characteristic

14.

The factor to be considered in preparing build-up rate for reinforcement works. Choose all correct answer.

a)

Reinforcement cost

b)

Wastage and spacer cost

c)

Labour cost

d)

Binding wire

15.

Given the useful life of machinery is 6 years and working days per year is 250. Calculate the total working hours for 1 year.

a)

1500

b)

2000

c)

2250

d)

2500