1.

This method of compensation is frequently used where there is continuing relationship involving a series of projects

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

2.

It establishes a fixed sum over and above reimbursement for the Architect's technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

3.

This method of compensation may be applied to government projects since they entail more paper work and time-consuming efforts

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

4.

When the suspension of construction exceeds a period of ___________, the fee for the remaining works shall be doubled.

a)

6 months

b)

12 months

c)

3 months

d)

30 days

5.

During the progress of work, the Owner shall furnish the Architect a copy of the records of expenses being incurred on the construction. Upon completion of the project, the Owner shall furnish the Architect a copy of the summary of all cost of labor, services, materials, equipment, fixtures and all items used at and for the completion of the construction.

a)

Cost records

b)

Contract records

c)

Records of construction

d)

Minutes of meeting records

6.

Shall include cost of the construction as well as all professional fees, permits, clearances, and utilities and cost of acquiring the project site or lot, cost of money, etc.

a)

Project development cost

b)

Construction cost

c)

Cost records

d)

Estimates

7.

Prescribes space plans, stacking diagrams or sections and computations of areas for the different activities and spaces to be integrated in a building project

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

8.

Involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept

a)

Acoustic design services

b)

Sound design services

c)

Architectural sound design services

d)

Aural design services

9.

Involves the detailed planning and design of light transmission, timing, and control for compatibility with the architectural design concept

a)

Architectural lighting layout and design services

b)

Lights and design services

c)

Natural lighting layout services

d)

Acoustic design services

10.

The Architect, upon designing a building or structure, complements this with the design of the surroundings that will make the space fit for a specific mood and for the required activities. He lays out the open spaces in and around the structure such that they contribute to the totality of the project.

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

11.

Concerned with the general quality of the settings for people and their activities, buildings and other natural and man-made phenomenon

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

12.

Calls for the detailed study of physical, social, economic and administrative components and as such requires the expertise and knowledge of Specialist Consultants (SCs)

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

13.

The suitably trained and experienced Consulting Architect in this area of architectural practice provides research, assessment, recording, management, interpretation, and conservation of historical heritage

a)

Historic and heritage conservation and planning

b)

Forensic architecture

c)

Building systems design

d)

Facilities maintenance support

14.

The Consulting Architect in this area of practice arranges and formulates methods of rating and ascertaining the value of structures or facilities which must be fully secured, kept safe, protected, assured, guaranteed and provided sufficient safeguards for the conduct of any work or activity.

a)

Security evaluation and planning

b)

Facilities maintenance support

c)

Building testing and commissioning

d)

Building environment certification

15.

The Architect in this area of practice engages in methods of producing building components in a highly engineered, efficient, and cost-effective manner, particularly for residential and commercial applications

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

16.

The Consulting Architect in this area of practice provides the Owner with means and measures to ensure the proper function and maintenance of the building/structure and site after final inspection

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

17.

The Architect in this area of practice recommends the systematic process of ensuring that a building's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

18.

The Consulting Architect in this area of practice must have much more than the basic knowledge of Green Architecture and Environmental and/or Sustainable Design and sufficient knowledge of the governing environmental laws and environmental investigation processes and procedures under international protocols such as the Philippine Solid Waste, Clean Air and Clean Water Acts, DENR administrative issuances and the like.

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

19.

The Architect in this area of practice undertakes a scientific study on the built environment's well-being, which allows the Architect to focus on the ways in which the building or structure can best maintain itself and prolong its life in a cost-efficient manner, and finally provide recommendations to the Owner

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

20.

Defined as an act or process of estimating value. The Consulting Architect in this area of places value on the building or structure conditions and defects, and on its repair and maintenance, including the required improvements

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

21.

The Architect in this area of practice conceives, chooses and develops the type, disposition, arrangement and proportioning of the structural elements of an architectural work, giving due considerations to safety, cost-effectiveness, functionality and aesthetics

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

22.

The Consulting Architect in this area of practice must have much more than the basic knowledge of site analysis, space planning and management, architectural programming, and the other services under SPP Document 201

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

23.

The Architect in this area of practice must have much more than the basic knowledge of specification writing, estimation and quantity survey, architectural production, architectural software, architectural support services, and contract document review

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

24.

The Consulting Architect in this area of practice must have much more than the basic knowledge of pre-construction, construction, post-construction and the other services under SPP Documents 204, 206, and 207

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

25.

The Architect in this area of practice must have much more than the basic knowledge of the various modes of Alternative Dispute Resolution (ADR) prescribed under R.A. No. 9285, the ADR Act of 2004 and its IRR

a)

Dispute avoidance and resolution

b)

Special building / facility planning and design

c)

Administrative matters

d)

Management of architectural practices

26.

The Architect in this area of practice must have much more than the basic knowledge of the planning and design processes required for housing developments, recreational and tourism estates, health care and hospitality facilities, transportation and telecommunication facilities, production and extractive facilities, utility-related developments, secure facilities, business and industrial parks, economic zones and community architecture and the like

a)

Dispute avoidance and resolution

b)

Special building / facility planning and design

c)

Administrative matters

d)

Management of architectural practices

27.

The Consulting Architect in this area of practice must have much more than the basic knowledge of building materials and finishes, construction methodologies, building envelopes including cladding and roofing systems, architectural fenestrations and architectural hardware, fixtures and fittings

a)

Building components

b)

Management of architectural practices

c)

Special building / facility planning and design

d)

Dispute avoidance and resolution

28.

The Architect in this area of practice must have much more than the basic knowledge of the types of architectural office operations, architectural office management, accounting and audit, labor code, architectural marketing and project development, proposals and contract administration, file management, limitations of business process outsourcing (BPO), and knowledge process outsourcing (KPO) operations

a)

Building components

b)

Management of architectural practices

c)

Special building / facility planning and design

d)

Dispute avoidance and resolution

29.

Responsibility only of Construction Supervision Group to the Owner

a)

Administrative matters

b)

Construction matters

c)

Contract matters

d)

Technical matters

30.

An Architect nominated by the Owner and approved by IAPOA to organize the ADC on behalf of the Owner

a)

Professional advisor

b)

Technical advisor

c)

Competition secretariat

31.

Responsibility only of Construction Supervision Group to the Architect of record

a)

Administrative matters

b)

Construction matters

c)

Contract matters

d)

Technical matters

32.

Specialist personnel who may be consulted by the Jurors during the conduct of the ADC to permit them to obtain all necessary relevant information

a)

Professional advisor

b)

Technical advisor

c)

Competition secretariat

33.

The body formed by the Owner and approved by the Professional Advisor to assist the Professional Advisor and the Jury in the administrative conduct of the ADC

a)

Professional body

b)

Technical advisor

c)

Competition secretariat

34.

Standards of Professional Practice (SPP) on Pre-Design Services

a)

SPP Document 200

b)

SPP Document 201

c)

SPP Document 202

d)

SPP Document 203

35.

Standards of Professional Practice (SPP) on Regular Design Services

a)

SPP Document 200

b)

SPP Document 201

c)

SPP Document 202

d)

SPP Document 203

36.

Standards of Professional Practice (SPP) on Specialized Architectural Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 203

37.

Standards of Professional Practice (SPP) on Full-time Supervision Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 204

38.

Standards of Professional Practice (SPP) on Construction Management Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 204

39.

Standards of Professional Practice (SPP) on Post-Construction Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

40.

Standards of Professional Practice (SPP) on Comprehensive Architectural Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

41.

Standards of Professional Practice (SPP) on Design-Build Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

42.

Standards of Professional Practice (SPP) on Architectural Design Competition (ADC)

a)

SPP Document 209

b)

SPP Document 208

c)

SPP Document 210

d)

SPP Document 207

43.

Standards of Professional Practice (SPP) on Professional Architectural Consulting Services (PACS)

a)

SPP Document 209

b)

SPP Document 208

c)

SPP Document 210

d)

SPP Document 207

44.

This method of remuneration is particularly suited to engagements involving intermittent personal service. When such consulting services are furnished, the Professional Consulting Architect (PCA) is compensated for all the time he devotes to the work, including travel time.

a)

Per diem or hourly basis

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expenses

d)

Professional fee plus expenses

45.

This method of remuneration is used when the services of a Professional Consulting Architect (PCA) is expected to be required at intervals over a period of time. It is a means of ensuring in advance that his services will be available to the Client when required.

a)

Retainer

b)

Professional fee

c)

Contract bond