1.

Having a direct access without the necessity of removing a panel, door or similar obstruction.

a)

accessible

b)

accessible, readily

c)

applicability

d)

approved

2.

The unobstructed vertical distance through free atmosphere between the lowest opening from a pipe, plumbing fixture, appliance, or appurtenance conveying waste to the flood level rim of the receptor,

a)

Directed Gap

b)

Air Gap, Drainage

c)

Air Break

d)

Plumbing

3.

The physical separation which may be a low inlet which may be a low inlet into the indirect waste receptor from the fixture, appliance, or device indirectly connected.

a)

Appliance

b)

Accepted engineering practice

c)

Air Break

d)

Air Gap

4.

A room equipped with a shower, bathtub or combination shower/bath.

a)

Bathroom

b)

Half Bath

c)

Jack and Jill Bathroom

d)

Powder Room

5.

The part of lowest piping of the drainage system that receives the discharge from soil, waste or other drainage pipes inside the walls of the building and conveys it to the building sewer beginning 2 ft. outside the building wall.

a)

Sewer Drain

b)

Building Drain

c)

Building Sewer

d)

Building Sewer Primary Drain

6.

Acceptable to the Authority Having Jurisdiction.

a)

Allowed

b)

Approved

c)

Omitted

d)

Permitted

7.

A specially designed system of waste piping embodying the horizontal wet venting of one or more sinks of floor drains using a common waste vent pipe adequately sized to provide free movement of air above the flow line of the drain.

a)

Commination Waste and Vent System

b)

Combination Building Sewer

c)

Combination Sewer

d)

Combination of Venting Pipes

8.

A vertical vent that is a continuation of a drain of witch it connects

a)

Vent

b)

Continuous Vent

c)

Circulating Vent

d)

Air Flow

9.

The length along the centerline of pie and fittings

a)

critical level

b)

Critical area

c)

Developed length

d)

Drainage System

10.

The top edge of a receptor of with water overflows

a)

pour out

b)

flood level rim

c)

bad valve

d)

critical level

11.

The vertical drainage pipe for conveying storm water from roof or gutter drain.

a)

Stack

b)

Leader

c)

Riser

d)

Waste Stack

12.

Cross linked Polyethylene

a)

PEX-AL-PEX

b)

PEX

c)

PE

d)

PB

13.

The pressure that exists without any flow

a)

static pressure

b)

residual pressure

c)

negative pressure

d)

vacuum

14.

A mandatory requirement (MUST)

a)

Shall

b)

May

c)

Permitted

d)

Omitted

15.

The vertical main of a system of soil, waste, or went piping extending through one or more stories.

a)

stack

b)

leader

c)

stack Vent

d)

leader vent

16.

A pipe or fitting that is installed in a vertical position or that makes an angle of not more that 45 degrees with the vertical.

a)

horizontal

b)

vertical

c)

sloped

d)

leader

17.

A vent that also serves a drain

a)

dry vent

b)

wet vent

c)

moist vent

d)

watered vent

18.

Hot Water is defined when water exceeds or is equal to _________ degrees.

a)

110

b)

120

c)

108

d)

112