wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Physical Instability

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Working from exchange, B2B from MDF with Max. attainable Speed, port restarting will consider as a fix

a)

TRUE

b)

false

2.

PO completed, changing CPE ,Any change in internal wiring or remove splitter will consider as a fix.

a)

TRUE

b)

false

3.

during follow physical instability case clear view modes output (Run Real Time Profile Optimization ) .What is your action ?

a)

Check Voice Verification then Escalate to IU

b)

Troubleshoot as not supported by ASSIA

c)

Check if line connected from main wire

4.

during follow physical instability case clear view modes output (No action can be recommended because some DSL-Expresse modules are down ) .What is your action ?

a)

Troubleshoot as not supported by ASSIA

b)

Check Voice Verification then Escalate to IU

c)

Check if line connected from main wire

5.

What is the name of the fault that makes you do that?(Ask the customer if there is any EMF cable like "Dish Cable " Passes beside telephone line "main wire " and inform him to make it so far from telephone line “main wire")?

a)

Low-frequency Cross talk

b)

High Power Noise

c)

Bad-splice

6.

Way of communication for Physical Instability Contradiction Case ?

a)

Phone call or SMS

b)

Phone call

c)

Phone call or SMS or Recorded message

7.

SLA for Physical Instability Contradiction Case ?

a)

2Hour

b)

2 Day

c)

2 Working Day

8.

CCA should Re-Run the appropriate mode of Clear View Analysis after any fix done from customer side

a)

TRUE

b)

false

9.

In physical instability in case (working from exchange without a visit) update,will re escalate case to MV pool directly and inform customer with MV SLA

a)

TRUE

b)

false

10.

In physical instability We will escalate the tickets to ( Pilot-Follow Up ) Although it was solved if he was connected from wall outlet .

a)

TRUE

b)

false