Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CDA - Who wants to be a Millionaire? Part 2

Total questions: 10

Worksheet time: 2mins

Name
Class
Date
1.

What solution should PwC sell MBE?

a)

Operating Model

b)

Oracle implementation

c)

SAP implementation

d)

Change and communications

2.

What are the benefits of using Transform?

a)

Standard method and solid structure

b)

Prevent waste of time

c)

Produce a high quality of work every time

d)

All of the above

3.

What stages are the Construct stages?

a)

Build and Test

b)

Design and Test

c)

Design and Build

d)

Test and Implement

4.

When do I use the pricing calculator?

a)

During proposal stage

b)

Project kick-off

c)

When the team resources change

d)

All of the above

5.

The industrialised delivery approach began due to…

a)

The firm was not profitable enough

b)

Clients were complaining about the consultants being too expensive

c)

Lack of experienced PMOs, low quality delivery, cost challenges, poor contract management

d)

Good contract management and relatively high quality performance

6.

What is CDT used for?

a)

To check the quality of the deliverables

b)

Describes, at a very high level, the work that should be done during each stage

c)

A checklist to be used at the end of the stage to self-assess and determine engagement ‘health’

d)

All of the above

7.

What are the stages of Pursuit?

a)

Target, Interact, Propose, Close, Exceed Expectations

b)

Target, Review, Propose, Close Exceed Expectations

c)

Propose, Interact, Close, Exceed Expectations

d)

Target, Propose, Close, Exceed Expectations

8.

What is a technical debt lock?

a)

Client debtors

b)

Supplier debtors

c)

Requirements not developed

d)

All of the above

9.

What were the key issues in the MBE case study?

a)

Logistics

b)

Decentralised system

c)

Human capital management

d)

Low customer satisfaction

10.

What are the benefits of Industrialising delivery?

a)

xLoS Collaboration and effective teamwork

b)

Delivering quality work, Clear delivery and value expectations

c)

Proactive and stable management and reduce unnecessary stress

d)

All of the above