WorksheetsCONTRACT MANAGEMENT
Total questions: 14
Worksheet time: 7mins
CONSTRUCTION MANAGEMENT SERVICES DOES NOT INCLUDE :
SCHEDULING & COST CONTROL
COST CONSEQUENCES OF DESIGN AND CONSTRUCTION DECISIONS
DESIGN AND CONSTRUCT THE CONSTRUCTION
COORDINATION OF CONSTRUCTION ACTIVITIES
THE ADVANTAGES OF CONSTRUCTION MANAGEMENT EXCEPT :
QUALITY CAN BE ASSURED BY THE HIGH LEVEL OF SUPERVISION BY THE PROJECT MANAGER
SAVE THE COST OF THE OVERALL PROJECT
SUITS COMPLEX PROJECTS WHERE THE DESIGN CAN BE DEVELOPED IN STAGES
AS DESIGN FOR EACH WORK PACKAGE IS COMPETED, WORK CAN BEGIN
THE DISADVANTAGES OF CONTRACT MANAGEMENT ARE :
THE PROJECT WILL BE DELAYED AND COST WILL INCREASE
NO COMMITMENT ON PRICE UNCERTAINTY
TOTAL COST OF PROJECT IS NOT USUALLY KNOWN UNTIL THE PROJECT IS WELL UNDER WAY
THE CLIENT TAKES ALL RISK
What is design and build method ?
contractor only responsible for construct the project and delivery the completed project in accordance in the contract document
single contractor that has been appointed to design and construct the works
An advantages of design and build approach is that construction can be begin before design 100% complete.
true
false
What is the disadvantages of design and build method ?
earlier commencement on site
lack of check and balance
reducing project delivery time
The client, designers and contractor are the prime movers to ensure succesful completion of project. You as a project manager of Megah Holdings to award the contract to make sure the project completed within cost time and quality.
fast track contract
lump sum
partnering
An ongoing stadium to be renovated or upgraded before the upcoming sea games. What are the advantages of fast track contracts?
reduced time
trustworthy parties
greater quality
There are many methods of awarding a contract available. Price Based System/Fixed Price Contract are consist of except
Lump Sum (LS) Contract
Schedule of Rates (SoR) Contract
Bill of Quantities (BoQ) Contract
Cost Plus Percentage of Cost Contract
Examples of Project for Lump Sum Contract are as follows except
High rise building
Signalization
Painting
Guardrail
In Bill of Quantities (BoQ) contract, the detail price of each item is quoted. True or false?
True
False
Below are Standard Forms of Contract that commonly use in Malaysia except
FIDIC
PWD
PAM
ICE
Which of these contract form is derived from ICE
IEEE
FIDIC
PAM
PWD
What is the purpose of standard form of contract for construction
To specify the key variables concerning construction
To form a complete construction planning
To build a legal and safety for building and civil construction