wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

GIS Unit - 4 Quiz

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

The accuracy of data analysis depends on the accuracy of ________________ in terms of their location and shape

a)

Surveying Map

b)

Satellite Map

c)

Spatial features

d)

Scanners

2.

Mention the types of analysis used with vector data

a)

Buffering

b)

Overlay

c)

Feature Manipulation

d)

All the above

3.

The buffer distance or buffer size will be

a)

vary with given field

b)

always constant with given field

c)

Zero

d)

None of the above

4.

___________ is used as a subset of point, line and polygon theme as another polygon theme as boundary.

a)

Set

b)

Feature

c)

Clip

d)

Polygon input

5.

Split causes the input features to form a subset of multiple output feature classes

a)

True

b)

False

6.

An overlay operation combines the geometries and attributes of feature layers to create the output using

a)

Intersect

b)

Union

c)

Union & Intersect

d)

Split

7.

______________ tool can identify features that are closest to one another

a)

Overlay

b)

Extract

c)

Proximity

d)

Buffering

8.

How many types of networks that can be modeled in GIS

a)

3

b)

4

c)

5

d)

6

9.

Utility networks includes

a)

water mains

b)

sewage lines

c)

electrical circuits

10.

Transportation networks includes

a)

roads

b)

railroads

c)

flight paths

d)

All the above

11.

Factors affecting Highway alignment

a)

Drainage

b)

Traffic

c)

Economics

d)

Road Stability

e)

All the above

12.

The purpose of network analysis tool is

a)

to locate a place with less time travel

b)

Shortest route

c)

None of the above

d)

Both 1 & 2

13.

Shortest path analysis

a)

finds the path with minimum cost

b)

finds the path with minimum time to reach

c)

finds the path with minimum distance

d)

None of the above

14.

Which is the best suitable algorithm for Shortest path?

a)

Spanning tree

b)

Queue

c)

Dijkstra algorithm

d)

Travelling Salesman Problem

15.

What will be the cost of Source node in Shortest path analysis?

a)

Zero

b)

One

c)

Two

d)

Three

16.

What is the objective of travelling salesman problem

a)

find best route to reach the destination

b)

find best route to reach all the nodes in the path

c)

find the minimum distance route

d)

None of the above

17.

Ojective of the vehicle routing problem is to schedule vehicle routes and visits to customers in such a way that the

a)

total travel distance is minimized but time increases

b)

total travel distance is maximized and time increases

c)

total travel time is minimized

d)

None of the above

18.

DEMs are a primary data source for

a)

terrain mapping and analysis

b)

Land cover/ Land surface

c)

to analyse vegetation

d)

to count wildlife and habitats

19.

The main techniques are used in DEM are optical sensors, interferometric synthetic aperture radar (InSAR), and light detection and ranging (LiDAR).

a)

optical sensors

b)

interferometric synthetic aperture radar (InSAR)

c)

light detection and ranging (LiDAR)

d)

All the above

20.

How DEM is used in GIS Applications

a)

Remote sensing and mapping

b)

Data monitoring and analysis

c)

find the shortest path in the vehicle routing problem

d)

None of the above