WorksheetsCSS 10 Week 3 and 4
Total questions: 25
Worksheet time: 13mins
What should you do before using any (PPE) personal protective equipment?
Buy First
Inspect PPE
Read Instructions
None of the above
Which PPE is fall protection device used when climbing?
Hard Hat
Body Belt
Safety Boots
High Voltage Sign
Which PPE is used to give protection to the head?
Gloves
Goggles
Hard Hat
Body Belt
Which PPE is attached to stationary and non-stationary object to prevent user from falling down?
Bolt Cutter
Wire Cutter
Safety Harness
Tabbing Shears
Which PPE is used to protect the eyes from debris?
Mask
Goggles
Sun Glasses
Prescription Glasses
Which PPE is used to protect the foot from impact and punctures caused by sharp objects?
Slippers
Sneakers
Safety Shoes
Leather Shoes
Which PPE is used to protect the hands from electric shock and sharp objects?
Gloves
Mittens
Gauntlet
Safety Ring
Which traffic sign is used to redirect the flow of traffic?
Safety Cones
Road Work Sign
Worker Ahead Sign
High Voltage Sign
Which traffic sign is used to alert the workers about the electrical hazard in the area?
Safety Cones
Road Work Sign
Worker Ahead Sign
High Voltage Sign
Which traffic sign is used to warn and guide the traffic and pedestrian about the on going road work ahead?
Safety Cones
Road Work Sign
Worker Ahead Sign
High Voltage Sign
Which traffic sign is used to inform traffic that there are workers ahead and they should slow down?
Safety Cones
Road Work Sign
Worker Ahead Sign
High Voltage Sign
How far should you place the “road work sign” before the construction area?
1 meter
5 meters
10 meters
20 meters
How far should you place the “worker ahead sign” before the construction area?
1 meter
5 meters
10 meters
20 meters
How far should you place the “high voltage sign” near the telecommunication pole?
1 meter
5 meters
10 meters
20 meters
Upon inspecting the body belt, you notice the buckle is distorted. What would you do about it?
Use anyway
Will not use it
Abandon work
Use ladder instead
Which of the following Law is the National Building Code of the Philippines?
R.A. 10627
P.D. 932
R.A. 4136
P.D. 1096
Which of the following government agency is responsible in granting a building permit?
DTI
DENR
DOLE
DPWH
Which of the following is NOT included in the Local Government Unit (LGU)?
City
DPWH
Barangay
Municipality
Which of the following government official is the primary signatory of the barangay permit?
Kalihim
Kapitan
Kagawad
Punong Barangay
Which of the following government official is the primary signatory of the Municipal / City Permit?
Mayor
Councilor
Governor
Congressman
You have to request the building permit in the City where the proposed telecom pole is NOT located.
True
False
You have DON’T have to fill-out the application form in requesting a Municipal / City Permit.
True
False
You have to proceed to the nearest DENR Office to obtain a building permit
True
False
You have to ask permission to the Home Owner’s Association before starting any site construction.
True
False
Presidential Decree No. 6901 is the National Building Code of the Philippines.
True
False