1.

What is the built environment?

a)

Materials to build houses with.

b)

Materials and resources to build things that impact on the environment.

c)

Resources to build flats with.

d)

Materials and resources to build things that have no impact on the environment.

2.

What year was the Environmental Protection Act introduced?

a)

1970

b)

1990

c)

1988

d)

1994

3.

Under the Hazardous Waste regulations of 2005, which of the following items would not be considered hazardous waste.

a)

Fluorescent Tubes

b)

LED Lights

c)

Metal Halide Lamps

d)

Sodium Lamps

4.

How many of the following are not parts of the Environmental Protection Act 1990

a)

Litter

b)

Wastes on land

c)

Household waste

d)

Genetically controlled organisms

5.

Under the Pollution Prevention and Control Regulations 2000 which of the following industries is not affected?

a)

Waste Incinerators

b)

Injection Moulding of Plastics

c)

Powder Coating and Galvanizing

d)

Crematoriums

6.

Under the Noise at Work Regulations 1989 how many action levels are there?

a)

1

b)

4

c)

2

d)

3

7.

Who must you register with in England and Wales under the Control of Pollution Act 1989 with regard to depositing controlled waste?

a)

The Countryside Alliance

b)

The Local Authority

c)

Health and Safety Executive

d)

Environment Agency

8.

Under the Packaging (Essential Requirements) Regulations 2003, what is not the main criteria?

a)

Packaging must be able to be recycled

b)

Packaging must maintain a level of safety for the packaged product

c)

Volume and weight of packaging should be designed and manufactured to the absolute maximum.

d)

Packaging can be reused

9.

Under the WEEE Waste Electrical and Electronic Equipment Directive 2007, what items would not be considered as Electrical and Electronic waste.

a)

Torch

b)

Washing Machine

c)

Laptop computer

d)

TV Stand

e)

Mobile phone

10.

What Building Regulation is related to Electrical Safety

a)

L

b)

P

c)

D

d)

E

11.

What Building Regulation is related to Fire Safety

a)

B

b)

N

c)

F

d)

G

12.

What Building Regulation is related to Ventilation

a)

Q

b)

H

c)

P

d)

F

13.

A Householder changes a socket outlet plate or a light switch. What action does he /she need to take.

a)

None as this is non notifiable work.

b)

Check with an Electrican that its ok.

c)

Tell the Local Authority Building Control.

14.

Which company is not a PART P provider

a)

ELECSA

b)

NICEIC

c)

The IET

d)

NAPIT

15.

Which Building Regulation is concerned with Conservation of Fuel and Power

a)

G

b)

L

c)

M

d)

N

16.

Which is the most important consideration out of the following in preventing waste?

a)

Re-cycling

b)

Re-use

c)

Energy Capture

d)

Minimization and Prevention

e)

Disposal

17.

Which year did the Controlled Waste Regulations come into force?

a)

1988

b)

1998

c)

2001

d)

1996

18.

What can a 'Smart Electricity Meter' not do?

a)

Monitor Electricity generated and sold back to the energy supplier.

b)

Automatically turn on electrical appliances in your home.

c)

Transmit the used energy readings to the energy provider.

d)

Transmit your cumulative energy usage to a remote display within the property.

19.

What Building Regulation is related to access and facilities or disabled people?

a)

D

b)

G

c)

H

d)

M

20.

What Electrical work does Part P not apply to:-

a)

The provision of at least one new circuit.

b)

Adding lighting points in a bedroom onto an existing circuit.

c)

Work carried out in kitchens.

d)

Work carried out in Bathrooms