wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

DGCA Module 10 FEB 2017

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

Mandatory modification

a)

Means the modification incorporated a/c accomplishment and item of equipment

b)

After type certification to maintain in an A/W condition

c)

Both a and b

2.

MTCS

a)

Type certificate is given to prototype A/C

b)

Type certificate has unlimited validation

c)

STC is not giving by DGCA

d)

Both A and B

3.

Fees for type certificate

a)

25000

b)

20000

c)

40000

d)

30000

4.

Test flight is done for

a)

MAOW

b)

MTOW

c)

Unusable fule

d)

Both A and B

5.

Shall be responsible for recording the results of the test flight

a)

PIC (Ref: car section 2 part page 04)

b)

Personal authorize by the operator

c)

Both a & b

6.

Any power or duty conferred or imposed by these.......... On the central government may be excess or discharge

a)

3A

b)

3b

c)

3

d)

3c

7.

Documents be carried on board

a)

7

b)

7A

c)

7B

d)

7c

8.

Fees for C of R is given in accordance to

a)

MTOW

b)

Seating capacity

c)

Both a and b

d)

None

9.

MTCS MEL

a)

Maintenance procedure given in DDPG

b)

Operational procedure given in DDPG

c)

MEL requirements accordance to MMEL

d)

All of the above

10.

Phase 1 training should be given to

a)

Group of person representing management structure

b)

Quality management and staff whose monitor the organization

c)

Both a and b (refer car 145 PZ 100)

11.

The central government may cancel or suspended C of R in accordance with sub rule

a)

17

b)

19

c)

15

d)

None of the above

12.

All required tool, equipment development for maintenance is given in

a)

AMP

b)

Maintenance data

c)

MOE

13.

Application of maintenance org is given in

a)

CA form 2, app 9(refer CAR M Sub Part F

b)

Any other form acceptable to DGCA

c)

Both A and B

d)

CA form

14.

Operator technical log preserved for

a)

24 months

b)

12 months

c)

36 months

d)

18 months

15.

Experience required for category c with respect to non-large a/c

a)

3 years of experience. Exercising B1 or B2 privileges on non-large a/c

b)

Car 145 B1 or B2 support staff

c)

Both a and b

16.

Category B2 license holder can issue CRS on

a)

Following maintenance on avionics and electrical system of an specific type of a/c

b)

Following maintenance on avionics and electrical system of an aircraft endorsed on license

c)

Following maintenance on avionics and electrical system of an a/c

d)

NTA

17.

The AME license becomes invalid an

a)

2 years

b)

3 years

c)

5 years

d)

10 years

18.

Eligibility criteria for application of AME license

a)

10+2 P, C

b)

10+2 P, C, M, B

c)

10+2 P, C, M

d)

NTA

19.

Which section of aircraft technical log contains details of next maintenance schedule

a)

Section 1

b)

Section 2

c)

Section 3

d)

NTA

20.

Deferred defect rectification included in

a)

A/C technical log book

b)

Procedure documents

c)

A/C technical log book or procedure document

21.

Components certifying staff requirements

a)

CAR section 2 series L part 14

b)

CAR section 2 series L part 12

c)

CAR section series L part 10

d)

NTA

22.

Person of MA subpart G org involved in management and review of CAMO

a)

Phase 1 only

b)

Phase 2 only

c)

Phase 1 + phase 2

d)

Phase 1+phase 2+ continuations training

23.

Phase 2 includes

a)

Details of SB

b)

Examination should be required at end of the phase

c)

MCQ and pass mark 75%

d)

Both B & C

e)

All of the above

24.

W. R. T. FTST it consists should include

a)

Some example of STC holder

b)

Some example of MFR documents showing CDCCL items

c)

None

25.

The actual weight of passenger may be considered for

a)

A/C weight up to 2000kg

b)

A/C weight less than 2000 kg

c)

A/C weight more than 2000 kg

26.

Definition SMS

a)

Is a management tool for the management of safety of an org reflecting an organization and orderly approach

b)

Potential out/come of hazard

c)

Safety arrangement of an organization

d)

All of the above

27.

Definition SSP(State safety program me)

a)

Min deg of safety that must be assured by a system

b)

Hazard identification and safety risk

c)

Integrated set of requirements and activity aimed at improving safety

d)

ATA

28.

The SMS implementation plan shall be endorse by

a)

Service provider

b)

Series management org

c)

Accountable executive

29.

Refueling of a/c during electrical strom

a)

Refueling should be stopped

b)

Refueling should be carried out until the damage will occur

c)

Refueling should be done until the next the flight

30.

MTCS

a)

Fees for validation of c of r is 50% of original fees

b)

Temporary c of r not issued by DGCA

c)

C of R may nit be cancelled in circumstances

d)

ATA

31.

Which one is phase 1

a)

Pre application

b)

Formal application

c)

Document evaluation

32.

FAX no. Is given in

a)

Registration marks

b)

Owner identification plate

c)

AOP

d)

NTA

33.

MTCS

AOP certificate

a)

Ceriticate true copy of an AOP along with operational specified shall be carried on board A/C operated by the operator

b)

Certificate true copy of an AOP along without operational specified shall be carried on board each A/C operated by the operator

c)

Certificate true copy does not require

d)

NTA

34.

How many phases are there for certification procedures for AOP

a)

3 phases

b)

4 phases

c)

5 phase

d)

Pre application for initial studies

35.

When small type of aircraft imported in india for first time

a)

AED accepted for by DGCA

b)

AED not accepted by DGCA

c)

LVTO is not acceptable by DGCA

d)

NTA