WorksheetsSOLAR MOD. 13: COMMISSIONING & MAINTENANCE
Total questions: 10
Worksheet time: 5mins
This is accepted by the NEC and the Canadian Electrical Code as evidence of approved equipment.
UL Listing Mark
All solar panels & inverters
All electrical devices
Only residential electrical devices
A(n) ___ is permission from the AHJ that authorizes construction work to begin and establishes the inspection requirements, but does not represent an approval of compliance with codes and standards.
contract
license
permit
bond
PV system _________ must include terminal polarity information and ratings for voltage, current, and power.
permits
license
BOL
labels
Space reserved around electrical equipment so that workers can install, inspect, operate, and maintain the equipment safely and efficiently is called....
dedicated
reserved
operating
working
What must be posted in a conspicuous location on the job site premises during solar system installation?
bond
permit
license
all of the above
At a minimum, a PV permit application must include...
a three-line diagram
full electrical schematics
a single-line diagram
both single-line & three-line diagrams
A nationally recognized testing laboratory is an OSHA-recognized, accredited safety testing organization that certifies equipment or materials to meet applicable standards would be...
NEC
IEEE
UL
Department of Energy (DOE)
All ______________ must have durable labels identifying the manufacturer and any listing marks or certifications.
solar panels
inverters
disconnect switches
all of the above
The organization, office, or individual designated by local government with legal powers to administer, interpret, and enforce building codes is the...
contractor
construction supervisor
solar integrator
AHJ
A(n) ____________________ is a local official qualified to review construction plans and documentation for compliance with applicable codes and standards.
testing laboratory
plans examiner
solar integrator
electrical engineer