The best method of compensation for continuing relationship with the client
Professional Fee Plus Expenses
Salary cost times a multiplier, plus direct cost or reimbursable expenses
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
What is R.A 9266?
Professional Regulation Commission
The Architecture Act of 2004
Letter of Instruction No.1000
Accessibility Law
The best method of compensation for scouting best site
Professional Fee Plus Expenses
Salary cost times a multiplier, plus direct cost or reimbursable expenses
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
Who is tasked to supervise the conduct of the ADC & the preparation of the conditions, including insuring the ADC timetable is adhered to, supervising the receipt of competitors’ questions, dispatch of reply to all competitors and the receipt of competition entries and safeguarding the anonymity of competitors at all times?
Jury
Competition Secretariat
Technical Advisor
Professional Advisor
The best method of compensation for non-creative work for technical hours spent?
Professional Fee Plus Expenses
Salary cost times a multiplier, plus direct cost or reimbursable expenses
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
Are buildings of the simplest utilization & character, which are without complication of plan/design or detail and which require only a minimum of architectural finishes, engineering and allied architectural elements.
Group 1
Group A
Type 1
Type A
The best method of compensation when the scope of services can be clearly and fully defined?
Professional Fee Plus Expenses
Salary cost times a multiplier, plus direct cost or reimbursable expenses
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
Management activities over & above the normal architectural and engineering services carried out during the regular services. The over-all objective is to have control over time, cost & quality relative to the construction of a project.
Full Time Supervision Services
Construction Management
Project Management
Construction Supervision
The best method of compensation that are interim in nature and often short in duration.
Unit Cost Method
Time Basis
Percentage based on Project Construction Cost
Lump Sum or Fixed Fee
Best method of compensation for Professional Consulting Architect (PCA) when services are expected to be required at intervals over a period of time.
Lump Sum or Fixed Fee
Per Diem or Hourly Basis
Bond
Retainer
PAYMENT SCHEMES OF AGREED ARCHITECT'S FEE:
Upon signing of the "Agreement"
15%
5%
20%
10%
Upon the completion of the Schematic Design Services, but not more than ____ days after the submission of the Schematic Design to the owner.
10
15
20
30
For alterations, renovations, rehabilitations, retrofit and expansion/additions to existing buildings belonging to Groups 1 to 5, the compensation of services should be a total of ____ of the RFP:
80%
100%
20%
150%
What is RA 9184?
An act prescribing policies, guidelines, rules and regulations for government infrastructure contracts
An act providing for the modernization, standardization and regulation of the procurement activities of the government and for other purposes
The Government Purchasing Reform Act
Revised rules and standards for economic and socialized housing projects
For this service, the Architect states the project Terms of Reference (TOR), which discusses the design intent, objectives and parameters necessary for the bidding of design services.
Pre-Feasibility Study
Architectural Programming
Feasibility Study
Design Brief Preparation
Per RA 9184, ABC stands for?
Appropriated Budget for the Contract
Approved Budget for the Contract
Approved Budget of the Contract
Actual Budget of the Contract
With regards to the construction phase, it is Architect's liability under the Civil Code.
10%
1%
5%
50%
When was the UAP established?
March 26, 1975
March 17, 2004
March 23, 1986
March 15, 2005
The UAP First Commissioner and issued Certificate No. 001 to UAP as the duly accredited professional organization of Architects in the Philippines.
Yolanda D. Reyes
Robert S. Sac
Teofilo S. Pilando Jr.
Ar. Eric Nubla
When was the Architecture Act of 2004 established?
March 26, 1975
March 17, 2004
March 23, 1986
March 15, 2005
The one responsible to shorten the time and lessen the cost.
Project Manager
Architect-of-record
Foreman
Contractor
What does PRC stand for?
(a)
After a change of use (renovation) of the building, what should be secured?
Fire Safety Inspection Certificate
Occupancy Permit
Building Permit
NOTA
The approved form of security furnished by the Contractor and his Surety as a guarantee of good faith on the part of the Contractor to execute the work in accordance with the terms of contract.
Performance Bond
Payment Bond
Proposal Bond
Agreement Bond
What bond is a guarantee to enter into a contract if awarded?
Performance Bond
Payment Bond
Proposal Bond
Agreement Bond
A written document describing in detail the scope of work, materials and equipment to be used, method of installation or application and the quality of workmanship for a certain work to be placed in a contract.
Specifications
Details
Structural Plans
Structural Details
The services of the Architect as Construction Manager can be compensated by a Recommended Professional Fee (RFP) of ____.
1.5% to 3% of the Project Construction Cost
1% to 1.5% of the Project Construction Cost
1.5% to 2% of the Project Construction Cost
4% to 6% based on Value Pricing
Not a requirement in the first page of a contract document.
Roof Plan
Vicinity Map
Perspective
NOTA
In RA 9184, what is not included under Alternative Methods of Procurement?
Repeat Order
Direct Contracting
Shopping
Wholesale Procurement
Which of the following professional documents is not required to be submitted by the Architect when applying for a building permit?
IAPOA Certificate
PRC Identification Card
Community Tax Receipt / Sedula
Professional Tax Receipt
Which of the following is not required in the application for building permit?
As-Built Plans
Transfer Certificate of Title of the Lot
Current Real Property Tax Receipt
Tax Declaration
Not considered part of the Architectural work.
Architectural Plan
Plumbing Layout
Column Layout
Structural Plan
A uniform classification system for construction specifications that is divided into several sections, each of which is sequentially numbered and named.
Specifications
Master Format
Addenda
Descriptive Specifications
Who should secure the building permit?
Contractor
Engineering
Client
Architect
The percentage of down payment of Owner to Contractor.
50%
70%
30%
80%
Upon the completion of the Schematic Design Services, but not more than ____ days after the submission of the Schematic Design to the owner.
30
15
7
10
Who will determine the height of a signboard if this will be installed in a project?
Architect
Engineer
Foreman
Contractor
What is the maximum amount the Architect pays if he violates the Code of Ethical Conduct?
PHP 500,000
PHP 1,000,000
PHP 5,000,000
PHP 2,500,000
Which is not part of Special Allied Services?
Equipment Evaluation
Forensic Architecture
Security Evaluation and Planning
Heritage Conservation
What is the RPF for the first 5 hectares?
PHP 10,000 per hectare / 5 pesos per sq.m
PHP 20,000 per hectare / 5 pesos per sq.m
PHP 60,000 per hectare / 5 pesos per sq.m
PHP 50,000 per hectare / 5 pesos per sq.m
It is a document used to provide guidance to the specifier in preparing a particular portion of the contract documents.
Guide Specifications
Details
Structural Plans
Master Format
What is the DAEDS and DADS Total Fee for Group 3 projects?
5% and 3%
7% and 4.20%
12% and 7.5%
6% and 3.6%
The most expensive procedure in selecting an Architect
Architectural Design Competition
Comparative Selection
Direct Selection
NOTA
Who provides the Continuing Professional Education?
IAPOA / UAP
BOA
PRC
NOTA
Which part of the RA 9266 states that an architect duly registered with the Board shall automatically become a member of the IAPOA & shall receive the benefits & privileges provided for upon payment of the required fees & dues.
Rule IV, Section 40
Rule IV, Section 41
Rule V, Section 40
Rule V, Section 41
Which section of the RA 9266 describes the Continuing Professional Development?
Article IV, Section 28
Article IV, Section 31
Article IV, Section 29
Article IV, Section 32
In design-build services with guaranteed maximum PCC, the project construction cost is guaranteed by the architect not to exceed ____ of the estimated project construction cost.
5%
10%
15%
20%
In the 2010 SPP, EWO means?
Extended Work Order
Ethical Work Order
Extra Work Order
Exchange Work Order
This refers to the range of professional services that covers pre-design services, regular design services, specialized architectural design services, construction services & post-construction services
Design-build Services
Comprehensive Architectural Services
Architectural Design Services
Post-Construction Services
A sole proprietorship, a partnership or corporation registered with the DTI &/or SEC 7 then with the BOA & PRC.
Freelance Partnership
Architectural Company
Architectural Corporation
Architectural Firm