MET quiz

Total questions: 15

Worksheet time: 9mins

Name
Class
Date
1.

Which system is preferred onboard ships?

a)

Insulated neutral system

b)

Earth neutral system

c)

All the above

d)

None of the above

2.

Insulated neutral system is preferred onboard ships . Justify

a)

yes. it is simple and cheaper

b)

No. it is costlier

c)

yes. essential machinery will still be run for an earth fault

d)

No. impossible to implement

3.

High voltage systems are adopted in ships with large loads to _________________________.

a)

reduce the size of current

b)

reduce the size of conductors

c)

Both the above

d)

None of the above

4.

Neutral earthing resistor (NER) connected between generator's neutral point and ship's hull is used in

a)

Low voltage (LV) adopted ships

b)

High voltage (HV) adopted ships

c)

both the above

d)

none of the above

5.

In general, more than one generator is synchronized together to handle (select all suitable answers)

a)

Manoeuvring with the bow thruster in use

b)

normal sea going conditions

c)

Cargo loading.

d)

None of the above

6.

Which of the following is/are electrical measuring equipment? (select all possible answers)

a)

Megohmmeter

b)

barometer

c)

Multimeter

d)

Clampmeter

7.

XLPE stands for

(a)  

8.

On tankers storage batteries shall not be installed in _________________.

a)

Cargo area

b)

area with Battery systems for emergency supply

c)

Both the above

d)

can be installed anywhere

9.

The most popular gas used in gas circuit breaker is _________

a)

Air

b)

Vaccuum

c)

LPG

d)

SF6

10.

The number of lighting points (lamps) connected to one final circuit (voltage rating over 55V to 125V)shall not exceed

a)

10

b)

14

c)

24

d)

36

11.

Short circuit protection should be set at

a)

overcurrent of more than 50 %, time delay (from 300 up to about 500 ms)

b)

value between 10 % and 50 % overcurrent, time delay of not more than 2 minutes

c)

overcurrent of more than 50 %, time delay of not more than 2 minutes

d)

value between 10 % and 50 % overcurrent, (from 300 up to about 500 ms)

12.

Over load protection produces an alarm and initiates

a)

Reverse-power trip

b)

Short-circuit trip

c)

Preferential trip

d)

holiday trip

13.

Every generator installed shall be equipped with (select all suitable answers)

a)

AVR

b)

Reverse power trip

c)

Synchronizer

d)

Transformer

14.

Salvaging is to _______________ IR.

a)

Degrade

b)

upgrade

c)

restore

d)

remove

15.

Below which insulation resistance value a rotating machine should be sent for salvaging?

a)

less than 0.5 Ω

b)

less than 0.5 MΩ

c)

less than 5 MΩ

d)

greater than 5 MΩ