Font size
WorksheetsLean Waste in Manufacturing
Total questions: 10
Worksheet time: 6mins
How many different types waste is in Lean Manufacturing?
4
8
10
5
What is the acronym for lean waste?
PLAYTIME
STEMWOOD
TEAMWOOD
TIMWOODS
Which one (1) is NOT a Lean waste
Miscommunication
Transportation
Motion
Inventory
What is Lean waste?
Any action or steps in a process that slows down production
Any action or step in a process that does not add value to the customer
An action that wastes time
An action that helps the customer
The original 7 waste (Muda) was developed by?
Shuntaro Furukawa
Akio Toyoda
Shinzo Abe
Taiichi Ohno
Which of these is NOT one of the original 7 waste?
Motion
Over processing
Skills
Defect
What are the TWO (2) countermeasure for Transportation waste?
Using a ‘Takt Time’ ensures that the rate of manufacturing between stations are even
Purchasing raw materials only when needed and in the quantity needed
Creating flow between processes
Developing a U-shape production line
Non-value-added activities are considered waste if they fall into one of the eight categories. Which waste ties up money in unsold product, material, and storage space?
Waiting
Excess inventory
Transportation
Over-processing
What is the TWO (2) ways to minimize /eliminate inventory waste?
To have proper planning to keep raw material and finished goods inventories as lean as possible
Clarify customers' standards and expectations ahead of time
Remove excessive or unnecessary machine movements/actions
Use Just-In-Time (JIT) inventory techniques
MUDA is a Japanese word carrying the meaning of ...
WASTE
EASY
PROFIT
LOST
