WorksheetsModule 4 test
Total questions: 15
Worksheet time: 30mins
When working with two fractions, the smallest number both denominators can be evenly divided into is the
_____.
a. numerator
b. lowest common denominator
c. minimum value
d. lowest common multiple
If you add 3 feet, 9 inches to 1 foot, 5 inches, the total measurement is _____.
a. 4 feet, 4 inches
b. 5 feet, 2 inches
c. 5 feet, 4 inches
d. 5 feet, 14 inches
On the engineer's rule, 50 hundredths (0.50) is equivalent to _____.
a. 6 inches
b. 5 inches
c. 4 inches
d. 3 inches
All the reference measures on a standard brick spacing rule _____.
a. fall between 2-7/8 inches and 3-1/2 inches
b. are shown in tenths of an inch
c. fall between 2-3/8 inches and 3 inches
d. are shown in sixths of an inch
In the modular grid system, a brick with a nominal length of 8 inches designed to be laid with a 3/8-inch
mortar joint would have a manufactured dimension of _____.
a. 7 inches
b. 7-1/2 inches
c. 7-5/8 inches
d. 8 inches
The polygon (many-sided figure) called a pentagon has _____.
a. three sides
b. five sides
c. six sides
d. eight sides
If a right triangle has shorter legs of 9 feet and 12 feet, the longest leg will be _____.
a. 13 feet
b. 14 feet
c. 15 feet
d. 18 feet
The drafting line in red shown in the figure above is a(n) _____.
a. dimension line
b. hidden line
c. extension line
d. center line
Dimensioning of exterior masonry walls on drawings is typically done to _____.
a. the outside of the wall
b. the center of the masonry unit
c. the inside of the wall
d. the center of the cavity
Interior elevation drawings, when used, are sometimes called _____.
a. detail drawings
b. specialty drawings
c. section drawings
d. design drawings
Utility easements are shown on the _____.
a. electrical plan
b. floor plan
c. plot plan
d. mechanical plan
In a set of construction drawings, the largest amount of information will be found on the _____.
a. plot plan
b. elevation drawings
c. section drawings
d. floor plan
In addition to describing the materials for a project, detailed technical specifications _____.
a. define how materials are to be assembled and finished
b. include a schedule for materials delivery to the site
c. specify the amount to be paid for the materials
d. identify acceptable substitute materials
Information not found on the drawings, but needed to complete the work, is contained in the _____.
a. standards
b. specifications
c. schedules
d. codes
If completed work does not meet code requirements, _____.
a. the contractor must pay a fine
b. the work must be done over
c. the architect must draw new plans
d. the worker responsible will be fired