1.

Which of the following statements are TRUE?

a)

Chemical reaction between cement and water is called Hydration

b)

Hydration will cause concrete to harden

c)

Hydration releases heat

d)

Hydration is a secret organisation for world domination. Hail Hydra!

e)

Incomplete hydration process will result in poor concrete quality

2.

Which of the following statements are TRUE for concrete?

a)

High compressive strength

b)

High tensile strength

c)

A type of composite material

d)

Combustible material

3.

After concrete placing, the next step in concreting procedure is ...

a)

Concrete batching

b)

Concrete compacting

c)

Concrete curing

d)

Concrete delivery

4.

Best description for the image shown is ...

a)

Reinforcement bar

b)

High tensile links or stirrups

c)

High tensile main bars

d)

Mild steel links or stirrups

e)

Metal scraps

5.

Best description for the image shown is ...

a)

Reinforcement bar

b)

High tensile links or stirrups

c)

High tensile main bars

d)

Mild steel main bars

e)

Metal scraps

6.

Referring to the column cross-section shown, which of the following statements are TRUE?

a)

Height of column is 400

b)

There are 7 numbers of this column

c)

The column has 8 numbers of 30mm diameter reinforcement bars

d)

Concrete cover is 25mm

e)

The column has 30 numbers of 8mm diameter reinforcement bars

7.

The concrete component shown in the image is ...

a)

Concrete plinth

b)

Concrete slab

c)

Column kicker

d)

Column base

e)

Column shoe

8.

R12 @250 in the image shown are ...

a)

12mm high tensile reinforcement main bar

b)

12mm mild steel reinforcement main bar

c)

12mm high tensile stirrups

d)

12mm mild steel stirrups

9.

The procedure shown in the image is ...

a)

Pre-tensioning of concrete beam

b)

Post-tensioning of concrete beam

c)

Post-tendoning of concrete beam

d)

Pre-anchoring of concrete beam

10.

Which of the followings are TRUE for curing process?

a)

Curing process is intended to control the temperature of the concrete during hardening stage.

b)

Curing is to avoid poured concrete from drying out too fast, which could lead to cracks and strength will drop (weaker)

c)

Curing can be done by covering the concrete surface with waterproof plastic membrane

d)

Curing can be done by keeping the concrete surface wet with sprayed water