CLASS E in MYCESSM2 refers to Demolition and Site Clearance.
TRUE
FALSE
Water bodies shall consist of, but not limited to, rivers, lake and sea, unless expressly required.
This Definition rules refers to ....
E110, D1
E120, D3
E100, D3
E120, D4
The project site clearance include 20 nos between 2.0 - 3.0 m girth of tree.
Choose the suitable code of MYCESMM2 for this activities.
(a)
The below rules applied to E311 EXCEPT
D5
D6
A5
A7
For Code E800, the additional rules applied is
A1
A2
A3
No Additional Rules Applied
Construction Activities ; Stripping of top soil is under MYCESMM2 Class (a) (b)
Excavation to remove Unsuitable Material refers to below EXCEPT
stumps
large amounts of roots and grass
earth
rubbish
Excavating for pile cap and group of piles as shown in the picture are under
Earthworks; Cut to Filling; Earth
Earthworks; Foundation; Earth
Earthworks, Cut and Dispose; Earth
Earthworks; Fillings; Replacement
Excavation Ancillaries; Timber Support left in refers to code (a)
TOTAL CUT = 1900M3
TOTAL USM = 520M3
TOTAL FILL = 2100M3
The volume for imported materials required is (a)
Match the following
F311
Close Turfing
F410
Excavation and disposal of rock using explosion
E211
Excavation of earth, including transportation, storage at site and filling
F133
Filling of material borrow pit from site
Material from Filling from borrow pit on the site is labelled as (a)
MyCESMM2 (2018) stands for ‘Malaysian Civil Engineering Standard Method of Measurement (2nd revision)’
True
False
Hydroseeding includes RULES (a) (b) (c) (d)