wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Sequence Words Quiz

Total questions: 7

Worksheet time: 2mins

Name
Class
Date
1.

__________, the clay needed to make bricks is dug from the earth with the help of a digger.

a)

Firstly,

b)

Then

c)

Next

d)

Following this

e)

Finally

2.

_________, the dug clay is spread on the metal grid and placed above the roller.

a)

To begin

b)

Next

c)

Before that

d)

Finally

3.

_________, sand and water is added to the clay and this mixture is either poured into the mould or undergoes wire cutting to make bricks.

a)

To start

b)

After that

c)

Once

d)

In the final stage

4.

____________, the bricks are placed for drying in the oven for 1-2 days.

a)

Following this

b)

In the initial step

c)

Lastly

d)

Finally

5.

____________, they are first heated in a kiln at a moderate temperature of 200 degree – 980 degree C and _________ at a high temperature of 870 – 1300 degree C respectively.

a)

Firstly, following this

b)

Lastly, next

c)

Before that, after that

d)

Subsequently, then

6.

The bricks are ________ cooled for 48-72 hours.

a)

then

b)

firstly

c)

finally

d)

before

7.

____________, the bricks are packed and delivered to their destination by trucks.

a)

In the beginning

b)

Secondly

c)

Finally

d)

Last but not least