WorksheetsProduction (operations) revision edexcel business gce
Total questions: 15
Worksheet time: 5mins
The green line =
buffer stock
re-order level
re-order quantity
maximum stock level
The blue line =
re-order level
buffer stock
re-order quantity
lead time
The yellow dotted line =
re-order quantity
re-order level
buffer stock level
minimum stock level
The re-order quantity =
40
50
20
60
The lead time =
a
b
c
Products are inspected for quality at the end of the production process
quality assurance
quality control
TQM
Output = 2000 units, maximum capacity = 4000 units
capacity utilisation = 80%
capacity utilisation = 40%
capacity utilisation = 50%
capacity utilisation = 20%
Output = 300 units, capacity utilisation = 75% therefore
maximum capacity = 200 units
maximum capacity = 400 units
maximum capacity = 300 units
maximum capacity = 375 units
Motivation and training to improve productivity is more important where production is
capital intensive
labour intensive
a flow system
machine produced
JIT = Joint in Transport
JIT = Just in Time
JIT = Juice in Tins
JIT = Jam in Transport
Lean production aims to
maximise waste
make diet products
minimise waist
minimise waste
Continuous production :
job
batch
flow
Output = 200 units from a firm with 5 workers
labour productivity = 20
labour productivity = 40
labour productivity = 1000
labour productivity = 100
Improve the capacity utilisation % by
reducing output
increasing capacity
reducing capacity
Problem of low capacity utilisation :
workers are busy
machines are fully used
average cost per unit is lower
average cost per unit is higher