Production (operations) revision edexcel business gce

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

The green line =

a)

buffer stock

b)

re-order level

c)

re-order quantity

d)

maximum stock level

2.

The blue line =

a)

re-order level

b)

buffer stock

c)

re-order quantity

d)

lead time

3.

The yellow dotted line =

a)

re-order quantity

b)

re-order level

c)

buffer stock level

d)

minimum stock level

4.

The re-order quantity =

a)

40

b)

50

c)

20

d)

60

5.

The lead time =

a)

a

b)

b

c)

c

6.

Products are inspected for quality at the end of the production process

a)

quality assurance

b)

quality control

c)

TQM

7.

Output = 2000 units, maximum capacity = 4000 units

a)

capacity utilisation = 80%

b)

capacity utilisation = 40%

c)

capacity utilisation = 50%

d)

capacity utilisation = 20%

8.

Output = 300 units, capacity utilisation = 75% therefore

a)

maximum capacity = 200 units

b)

maximum capacity = 400 units

c)

maximum capacity = 300 units

d)

maximum capacity = 375 units

9.

Motivation and training to improve productivity is more important where production is

a)

capital intensive

b)

labour intensive

c)

a flow system

d)

machine produced

10.
a)

JIT = Joint in Transport

b)

JIT = Just in Time

c)

JIT = Juice in Tins

d)

JIT = Jam in Transport

11.

Lean production aims to

a)

maximise waste

b)

make diet products

c)

minimise waist

d)

minimise waste

12.

Continuous production :

a)

job

b)

batch

c)

flow

13.

Output = 200 units from a firm with 5 workers

a)

labour productivity = 20

b)

labour productivity = 40

c)

labour productivity = 1000

d)

labour productivity = 100

14.

Improve the capacity utilisation % by

a)

reducing output

b)

increasing capacity

c)

reducing capacity

15.

Problem of low capacity utilisation :

a)

workers are busy

b)

machines are fully used

c)

average cost per unit is lower

d)

average cost per unit is higher