Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Creating a Build Environment

Total questions: 25

Worksheet time: 14mins

Name
Class
Date
1.

What are the four main building systems?

a)

Structural System

b)

Shaping System

c)

Envelope System

d)

Mechanical System

e)

Interior Systems

2.

What is the structural System?

a)

The system of shaping that keeps the building from collapsing

b)

The Beams that help keep a building from falling apart

c)

The system or framework of a building that acts like its skeleton.

d)

The blueprint of a building

3.

What is a building envelope/ envelope system?

a)

A paper that signs an agreement between to people

b)

The system that separates the exterior and interior environments.

c)

The system that separates the upstairs from the downstairs

d)

A letter that states who owns a building

4.

What are the three subsystems of an envelope?

a)

The Wall System

b)

The Mechanical System

c)

The Structural System

d)

The Below-Grade System

e)

The Fenestration System

5.

What is the Wall system?

a)

A system that provides support and compromises six basic layers(exterior, interior, drainage planes, air barrier, vapor, and insulation)

b)

A system that includes all floors below ground level( Basements, Underground apartment systems etc)

6.

What is The Below Grade System

a)

A system that includes all floors below ground level( Basements, Underground apartment systems etc)

b)

The system that refers to the window systems and exterior doors of a building.

7.

What is the Fenestration System

a)

The system that refers to the window systems and exterior doors of the building.

b)

A system that includes all floors below ground level( Basements, Underground apartment systems etc)

8.

The Roofing system is:

a)

A system that makes a building more modern and attractive

b)

A that makes a building look nice

c)

A system that covers the building and helps regulate the interior temperature.

d)

A system that keeps in touch with historical building styles

9.

A buildings mechanical systems control the:

a)

Air quality

b)

Temperature

c)

Fluids

d)

Electricity

10.

A design build is a:

a)

A system in which teams identify each Activity with a predetermined code.

b)

A project delivery method that includes three participants and two contracts.

11.

What is a code system?

a)

A system in which teams identify each activity with a predetermined code.

b)

A system that includes all floors below ground level( Basements, Underground apartment systems etc)

12.

What is a lump-sum contract?

a)

A payment contract wherein the owner pays the contractor the predetermined cost of the project

b)

A system that includes all floors below ground level( Basements, Underground apartment systems etc)

13.

What is a Critical Path method?

a)

A scheduling method where planners sequence activities for a stage and estimate the minimum time for each activity?

b)

A payment contract wherein the owner pays the contractor the predetermined cost of the project

14.

What is the Design-Build method?

a)

The method of building Modern Homes

b)

A contract between two people to build Towns

c)

The Method of designing and Building old historic like Building

d)

Involves a contract between two people. The owner and the person responsible for the construction

15.

The construction Management Method(CM) Has:

a)

Three participants(Owner, Architect, and Construction manager)

b)

Two Contacts

c)

Completes of all construction documents

d)

Three Contacts

16.

The lump-Sum Contract is when:

a)

The owner pays the overall cost of a project and a fee

b)

The owner pays the overall cost of the project

17.

The cost-plus free contract is when:

a)

The owner pays the contractor the overall cost and a additional fee

b)

The owner only pays a fee

c)

The owner pays the contractor only the overall cost

d)

The owner pays nothing

18.

What is a unit price Contract?

a)

The owner spends a limited amount on every stage due to it not being possible to estimate the cost.

b)

The owner spends the estimated cost plus fee

c)

The owner only pays the estimated cost

19.

What is the BIM software?

a)

A software that allows the users to create digital replicas of buildings

b)

A software that allows people to create replicas of things to see how durable they are

20.

What is the CAD software?

a)

A software that allows people to create and shape buildings

b)

A software that Allows architects to create and manipulate designs

21.

What does the NGBS Organization stand for?

a)

National Green Building System

b)

National Government Building Standard

c)

National Green Building Standard

22.

What is Leed?

a)

A rating system

b)

A building system

c)

A Green System

23.

ASTM Stands for?

a)

The American Society for Testing and Materials.

b)

The american Society for Testing Mammals

24.

What is the acronym for The American National Standards Institute.

a)

ANSI

b)

TANSI

25.

NAHB Stand for?

a)

National Association Of Housing Builders

b)

The National Association of Home Builders