wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Facility layout

Total questions: 13

Worksheet time: 13mins

Name
Class
Date
1.

What is the most important location decision factor in building service facilities?

a)

Proximity to customers

b)

Transportation cost

c)

Proximity to market

d)

Location of competitors

2.

Allocates shelf space and responds to customer behavior in buying products.

a)

product layout

b)

retail layout

c)

warehouse layout

d)

process layout

3.

Addresses the layout requirements of large and bulky projects.

a)

warehouse layout

b)

product layout

c)

fixed position layout

d)

cellular layout

4.

Deal with low-volume, high-variety production.

a)

product layout

b)

process layout

c)

cellular layout

d)

retail layout

5.

In ship manufacturing, the type of layout preferred is

a)

cellular layout

b)

layout strategy

c)

fixed position

d)

process strategy

6.

This photo is an example of a ________ layout.

a)

process

b)

warehouse

c)

retail

d)

product

7.

Used to achieve a smooth and rapid flow of large volumes of goods or customers.

a)

product layout

b)

process layout

c)

fixed position layout

d)

retail layout

8.

Positions workers, their equipment, and spaces/offices to provide for movement of information.

a)

process layout

b)

retail layout

c)

office layout

d)

fixed position layout

9.

Identify if the following pictures are examples of a Production Facility

a)

Yes

b)

No

10.

What is facility layout

a)

The process by which the structure of departments, workgroups within departments, workstations

b)

The process by which the facility of departments, workgroups within departments

c)

The process by which the placement of departments, workgroups within departments, workstations

d)

The process by which the space of departments, workgroups workstations and machines within a facility

11.

What is fixes-position Layout

a)

A layout whereby the input are brought to the site, where the output will be assembled rather than being moved

b)

A layout whereby everything are brought to the factory, where the product will be assembled rather than being moved

c)

A layout whereby the resources are brought to the site, where the product will be assembled rather than being moved

d)

A layout whereby the labor are brought to the factory, where the product will be assembled

12.

what is the process-oriented layout

a)

A design for the ceiling plan that involves arranging equipment and facilities according to their functions

b)

A design for the floor plan that involves arranging equipment and facilities according to their functions

c)

A design for the floor plan that involves arranging department and facilities according to their functions

d)

A design for the floor plan that involves arranging machine and tools according to their functions

13.

What is office layout?

a)

Space of office that employee work

b)

space for safety movement of employee

c)

comfort movement for the employee

d)

Grouping of workers, their equipment and the space or offices