WorksheetsCMMI V2.0 MPM Workshop Pre-Test
Total questions: 20
Worksheet time: 20mins
Name
Class
Date
1.
In which Category can the Practice Area – ‘Managing Performance and Measurement’ be found?
a)
a. Doing
b)
b. Managing
c)
c. Enabling
d)
d. Improving
2.
In which Capability Area can the Practice Area – ‘Managing Performance and Measurement’ be found?
a)
a. Sustaining Habit & Persistence
b)
b. Improving Performance
c)
c. Supporting Implementation
d)
d. Planning & Managing Work
3.
Why do we measure?
a)
a. To predict
b)
b. To characterize
c)
c. To evaluate
d)
d. All of the Above
4.
Which of the following is the task of project indicators:
a)
a. Help in assessment of status of ongoing project
b)
b. Track potential risk
c)
c. Help in assessment of status of ongoing project & track potential risk
d)
d. None of the mentioned
5.
Which of the following does not affect the software quality and organizational performance?
a)
a. Market
b)
b. Product
c)
c. Technology
d)
d. People
6.
How Which of the following is not a direct measure of SE process?
a)
a. Efficiency
b)
b. Cost
c)
c. Effort Applied
d)
d. All of the mentioned
7.
How Which of the following is an indirect measure of product?
a)
a. Quality
b)
b. Complexity
c)
c. Reliability
d)
d. All of the Above
8.
A graphical technique for finding if changes and variation in metrics data are meaningful is known as
a)
a. DRE (Defect Removal Efficiency)
b)
b. Function points analysis
c)
c. Control Chart
d)
d. All of the mentioned
9.
The Size and Complexity are a part of
a)
a. Product Metrics
b)
b. Process Metrics
c)
c. Project Metrics
d)
d. None of the above
10.
The Number of errors found per person hours expended is an example of a
a)
a. Measurement
b)
b. Measure
c)
c. Metric
d)
d. None of the above
11.
Percentage of modules that were inspected is part of ________?
a)
a. Process Metrics
b)
b. Project Metrics
c)
c. Product Metrics
d)
d. None of the Above
12.
What are the crucial characteristic/s of software metric?
a)
a. Valid
b)
b. Relevant
c)
c. Reliable
d)
d. All of the above
13.
Which of the following is a benefit for using the GQM paradigm hen software metrics are selected?
a)
a. Buy-in from the project personnel is achieved for the selected metrics
b)
b. Metrics are selected on the basis of organizational objectives
c)
c. Metric models are simplified to include only the most important elements
d)
d. Only well-defined metrics are selected
14.
The measure of personnel skill is a/an ___________ measure?
a)
a. Direct
b)
b. Indirect
c)
c. Objective
d)
d. Subjective
15.
Time, effort, capability, etc. … are known as __________________?
a)
a. Entities
b)
b. Attributes
c)
c. Measures
d)
d. Metrics
16.
Which of the following provide useful measures of software quality?
a)
a. Correctness, performance, integrity, usability
b)
b. Reliability, maintainability, integrity, sales
c)
c. Correctness, maintainability, integrity, usability
d)
d. Correctness, maintainability, size, satisfaction
17.
Which Defects removal efficiency (DRE) depends on:
a)
a. E – errors found before software delivery
b)
b. D– defects found after delivery to user
c)
c. Both E and D
d)
d. Varies with project
18.
What factor/s determine condition or quality of data?
a)
a. Accuracy
b)
b. Completeness
c)
c. Whether it’s up to date
d)
d. All of the Above
19.
An element of operational definition is:
a)
a. Criteria
b)
b. Test
c)
c. Decision
d)
d. All of the Above
20.
Cost and schedule are a part of ________?
a)
a. Product metrics
b)
b. Process Metrics
c)
c. Project Metrics
d)
d. All of the Above