WorksheetsE&C CHAPTER 9 COST OF THE COMPONENT REVISION TEST
Total questions: 10
Worksheet time: 5mins
The substance from which the product is made is called
Rawmaterial
Mould
Press tool
Component
Raw material cost is a point considered in finding ___
Component cost
Amortisation cost
Shearing cost
Tool maintenance cost
Labour cost =
Shift rate / no. of components produced per hour
Shift rate / no. of components produced per shift
Shift rate / no. of components produced per week
Shift rate / no. of components produced
Cost of the tool spread over no. of components is called
Cleaning cost
Shearing cost
Amortization cost
Surface finishing cost
Density of steel
8.7gm/cc
9.2gm/cc
7.8gm/cc
5.4gm/cc
Which cost is difficult to charge over each component, specially if the components are very small
Shearing cost
Cleaning cost
Amortization cost
Assembly cost
If the cycle time of a 2-cavity inj. Mould is 20 sec. How many components will be produced in 1 hour?
500 components
480 components
360 components
290 components
4 lakhs of components are produced in 2 yrs. Find the amortisation cost for a period of 1 yr if the mould cost is Rs20000
10 paisa
1 paisa
1 rupee
5 paisa
Find the labour cost, if the cycle time of a 2-cavity mould is 25sec and the shift rate is Rs100
40 paisa
4 paisa
20 paisa
10 paisa
Surface finishing cost can be charged either on area basis or on ___ basis.
Time
Weight
Rate
Shift