WorksheetsISO 9001:2015 IN DEPTH TRAINING
Total questions: 10
Worksheet time: 21mins
Which version of ISO 9001 currently certify by Top Glove Factories?
ISO 9001:2016
ISO 9001:2008
ISO 9001: 2015
ISO 9001: 2018
According to ISO 9001:2015, Organization needs to ensure traceability of output as the following:
Output identification
Status of output
Control unique identification of the output
All of Above
Clause 7.1.3 Infrastructure can include
Building & Equipment
Transportation & Information
Building, Equipment, Transportation, Information & Communication
Transportation & Equipment
Which clause of ISO 9001:2015 state that Organization shall conduct Internal Audit at planned interval
9.1
9.2
9.3
9.4
What are the tools that we used to analyses the external & internal issues and address the issues into risk or opportunity?
PESTLE
SWOT
MORTAR
All of the answers
Which statement below is not true about quality objective?
Quality objective shall be consistent with quality policy
Quality objective shall be measurable
Quality objective shall be communicated
Quality objective shall be known by external parties
What are the items need to be considered to determine risk and opportunity?
External and Internal issues
Issues and requirement from interested parties
Issues and internal audit
Quality policy and quality objective
Which statement below is not true?
Top Management shall demonstrate leadership and commitment with respect to customer focus
Quality policy shall be maintained, communicated and implemented by all relevant interested parties
The organization shall maintain and retain documented information
The organization shall assign the responsibility and authority for ensuring the integrity of the quality management system is maintained
Below are things to be considered when accepting customer order, except
Statutory and regulatory requirement
Customer specific requirement
Capacity and capability to produce such product
Customer competitor’s information
Below are the inputs of Management Review Meeting except:
i. Status of action from previous Management Review Meeting
ii. Resources need.
iii. Retain documents as evidence result of Management Review.
iv. Monitoring and Measurement result (KPI)
i and iv
i and ii
ii and iii
ii and iv