Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SPM Role Introduction

Total questions: 20

Worksheet time: 11mins

Name
Class
Date
1.

What is the right SPM Role Definition from the following options?

a)

Aimed for Suppliers of product developing and describing documentation, e.g. CAD data and drawings. We have the strategic responsibility regarding how to deliver and develop the product and describing documentation according to Volvo Cars Standards and requirements.

b)

The Purpose with the role is to pro-actively evaluate and manage the supplier manufacturing and logistics systems & related processes to eliminate all variability issues from suppliers (Quality and Delivery).

c)

Purchase of material,

establish, maintain and develop a competitive supplier base in a long-term

perspective and deliver products (value chains) according to target.

2.

This is an activity for Early Phase for the SPM Role:

a)

Drive Escalation

b)

PPAP(APQP)

c)

CBP

d)

All Options

3.

This is an activity for Industrialization Phase for the SPM Role:

a)

Ownership Q&D

b)

Running Changes

c)

PPAP (APQP)

d)

All Options

4.

What does it mean VPDS?:

a)

Volvo Product Development System

b)

Vehicle Product Development System

c)

Vehicle Prototype Development System

d)

Volvo Product Design System

5.

From VPDS, what is the milestone where R&D handover activities to SPM as main leaders for Project Launch:

a)

FDJ

b)

MP1

c)

VP

d)

TT

6.

In Volvo Agile WOW, What does it mean GCT?

a)

Global Council Team

b)

Global Category Team

c)

General Commodity Team

7.

Besides the Global Category Manager, who are the permanent members of the Global Category Team?

a)

Buyer, R&D, GDL

b)

Buyer, SQM(Category and Site), Cost Estimator

c)

Team Manager, SQM, IMQ

d)

PPT, IMQ, SQM

8.

What does it mean CBP?

a)

Category Business Plan

b)

Commodity Business Plan

c)

Cluster Business Plan

d)

Category Business Project

9.

What are the main contributors for CBP Overall Performance Score?

a)

VQE, SEMAT, Quality Performance, Delivery performance.

b)

Certificates, FASS, Trust.

c)

Escalation, MMOGLE, Sustainability.

10.

What does it mean SEMAT?

a)

Supplier Evaluation and Manufacturing Assessment Tool

b)

Supplier Engagement and Manufacturing Assurance Tool

c)

SQM Evaluation and Manufacturing Assessment Tool

11.

From the VPDS ver. 1.5, What are the milestones involved on the APQP Volvo Assessment?

a)

IRJ - FDJ - VP - TT - PP - MP1

b)

FDJ - VP - TT - PP - MP1

12.

Please Select the correct Volvo PPAP Phases for new launches:

a)

Non Saleable - Saleable - Full PPAP

b)

PV testing - Full PPAP

c)

R@R + PPAP Phase 0+, PPAP Phase 1/2, PPAP Phase 3.

13.

This is the method used in order to create part deviations after PP Series:

a)

Pre HPD

b)

TPD

c)

SRICA

d)

SREA

14.

This is the method used to document part deviations until TT Series:

a)

Pre HPD

b)

TPD

c)

SRICA

d)

SREA

15.

What does it mean VSIM?

a)

Vehicle Supplier Implementation Metrics

b)

Volvo Supplier Improvement Management

c)

Volvo Supplier Improvement Metrics

16.

Please pick up all valid options within Collaboration Portal.

a)

VQE

b)

Part Management

c)

KDP

d)

SEMAT

e)

CBP

17.

For SRICA process, What is the SQM main responsibility to follow with supplier? Select all possible answers:

a)

Site Relocation (Tier 1 and Volvo Direct Tiers)

b)

Manufacturing process change

c)

Tier 2 Relocation

d)

All Options

18.

What does it mean SREA?

a)

Supplier Request for Engineering Approval

b)

Submission Request for Engineering Approval

c)

Supplier Request for Industrialization Approval

19.

What are the two main types of Deviation at Volvo Cars?

a)

PRR/ CBP

b)

A Report/ T Report

c)

B30/ C10

d)

All Options.

20.

What is the recommended Problem Solving Methodology that Volvo Cars recommends to Supplier to follow up?

a)

5 Whys

b)

8Ds Report

c)

Is/Is Not

d)

Red X