OE CI METHANOL LEAGUE DAY 1

Total questions: 12

Worksheet time: 9mins

Name
Class
Date
1.

Warehouse Ronin (Warehouse)


Improvement of Good Receive Notes (GRN) Work Process


• Applied lean six sigma method on the GRN by communicate with end user & do the GRN less than ____ days as compared to previous years.

a)

2

b)

3

c)

4

d)

5

2.

Pull Men (Mechanical P1)


Special Tool for Ease of RO Membrane Change Out


• To reduce ______ case to zero and asset damage to zero.

a)

Brain injury

b)

Finger injury

c)

Leg injury

d)

Shoulder injury

3.

i-Tracker (TSD Inspection)


Establishing Inspection Worklist Tracking System in Improving 3.1.2 Manage Integrity Program


• i-Tracker facilitates all inspection SAP Notification between plants & reduces ________ in between Inspection Work Execution.

a)

communication

b)

cost

c)

time lag

d)

movement

4.

The Witch Hunters (Prod. Plant 2)


Equipment Reliability & Structured Round Efficiency Improvement Through Enhanced Visual Management


• To save _______ of operators to identify measurements are deviated from their safe operating limits and ensure equipments are operating within the defined SOL.

a)

manhours

b)

communication

5.

Flash Point (Prod. Plant 1)


First Line Maintenance Project


• To deploy _____________ as First Line Maintenance based on the identified scope in order to immediately arrest the potential hazards and prevent deterioration over time.

a)

Technicians

b)

Engineers

c)

Plant Operators

d)

Managers

6.

Vacuuminator (Mechanical P1)


Created Vacuum During Gauge Maintenance


• Created vacuum to avoid process

of ________ ___, hence rectification can be carried out straight away

(a)  

7.

Cas Men (Electrical)


Project Supports Plant Reliability


• Close monitoring will ensure (a)   are detected early and prolonging equipment life while maintaining plant running till the next opportunity.

8.

The Legacy Breakers (Finance)


Elimination of Custom's Site Visit & Approval for Asset Disposal


• Eliminated __ days process flow which involved custom's site visit and approval process.

a)

7

b)

9

c)

12

d)

14

9.

Shooting Star (Prod. Plant 1)


Pointbrella


• To address problem of taking samples during _______ at site which can cause sample result failure.

a)

day

b)

night

c)

raining

d)

flood

10.

IRONMEN (HSE)


JBPM Fire Extinguisher Certificate Monitoring


• Improved the tracking on ______ ____ of Jabatan Bomba during replacement of fire extinguishers

(a)  

11.

LST (Lab TSD)


Manhour Optimization for Silica Analysis Testing for Water


• Using alternative method (ICP-OES) instrument from current

UV-VIS _____________ technique

a)

spechtrophotometer

b)

spectrophotometer

c)

spetrophotometer

d)

speechtrophotometer

12.

The Brainiacs 2 (HRM)


Process Improvement via Power BI


• Provides a platform for (a)   effectiveness within department