Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Local Shelter Plan Day 1

Total questions: 9

Worksheet time: 3mins

Name
Class
Date
1.

It is a roadmap to address the housing requirement for both the formal and informal sectors of a city or municipality.

a)

CLUP

b)

LSP

c)

CDRA

2.

Charges the LGUs with provisions of shelter and its related services

a)

Climate Change Act of 2009 (RA 9279)

b)

Disaster Risk Reduction Act of 2010 (RA10121)

c)

LGC (RA 7160) and UDHA (RA 7279)

3.

What is lacking in the stages of LSP Formulation?

a)

Resource Analysis

b)

Affordability Analysis

c)

Situational Analysis

d)

Housing Needs Analysis

4.

The total need for new housing units.

a)

Housing Stock

b)

Housing Units

c)

New Housing Units Needed

5.

How do we compute the New Housing Units Needed?

a)

Housing Backlog + Future Need

b)

Homeless + Displaced+Double-Up

c)

Homeless + Future Need

6.

The year before the first planning period or the last census year.

a)

Base Year

b)

Planning Period

c)

Program Period

7.

Social unit consisting of a person or a group of persons who sleep in the same dwelling unit and have common arrangements for the preparation and consumption of food.

a)

Family

b)

Household

c)

Doubled-up

d)

Informal Settlers Families

8.

Covers the duration that will be needed to realize the housing vision of the LGU.

a)

Planning Period

b)

Program Period

c)

Base Year

9.

Refer to households living in a lot, whether private or public, without the consent of the property owner; or those without legal claim over the property they are occupying; or those living in danger areas such as esteros, railroad tracks, garbage dumps, riverbanks, shorelines, and waterways.

a)

Homeless

b)

Displaced

c)

ISFs

d)

Doubled-Up