Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Study Club W4 August '21

Total questions: 12

Worksheet time: 4mins

Name
Class
Date
1.

Berikut ini yang bukan merupakan SC Strategy adalah...

a)

Facility Location, Supply, Inventory

b)

Inventory, Transport, Product Development

c)

Information, Supply, Facility Location

d)

Inventory, Transport, Production System

e)

Production System, Facility Location, Supply

2.

In a SC there are three flows ...

a)

Information

b)

Material

c)

Risk

d)

Fund

e)

Man

3.

"A collection of decisions and actions

conducted by the organization or

some organizations to achieve their goals

Long-term predetermined in Supply Chain" is..

(a)  

4.

4 match strategies dalam supply chain strategy adalah

a)

Efficient

b)

Risk Hedging

c)

Responsive

d)

Agile

e)

Postponement

5.

Why Manufacturing Postponement?

a)

Large product variety with uncertain mix

b)

Many common components / sub-assemblies

c)

Relatively short lead time for final configuration (compared to waiting time tolerated by customers)

d)

Large Cost

6.

"Operations strategy is the strategic reconcialition of market Requirements with operations resources", Berdasarkan gambar berikut apakah pernyataan ini benar?

a)

IYAA

b)

NGAA

7.

Terdapat perbedaan antara pull system dan push system, lalu manakah jawaban yang benar dari pull system...

a)

Flexible capacity

b)

Authorize work releases based on system status

c)

Optimized effectiveness

d)

Focus is on controlling

e)

Control release rate, observe WIP level

8.

Nama lain dari metode penarikan “The Later Replenishment System” adalah.....

a)

あとほじ

b)

順序引き

c)

カムザキス

d)

はたりています

e)

キョウジズ

9.

Beberapa istilah dalam “Inventory control” pada Kanban yang salah yaitu....

a)

Container capacity

b)

Order quantity

c)

Order cycle

d)

Processing time

e)

Order point

10.

Pada rumus berikut ini, R memiliki arti?

a)

Ordering cost per lot

b)

Economic lot size

c)

Carrying or holding cost per dollar

d)

Monthly estimated demand quantity

e)

Unit cost

11.

Berikut ini aliran Kanban yang benar adalah..

a)

a. Material process

b)

b. Casting process

c)

c. Part machining process

d)

d. Part assembly process

e)

e. Final assembly process

12.

Terdapat beberapa tipe Kanban, pilih jawaban yang benar dari tipe Kanban...

a)

Immedietly Kanban

b)

Emergency Kanban

c)

Job-Order Kanban

d)

Though Kanban

e)

Ordinary Kanban