wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

HSSE Skill Area 5.0 - Permit to Work

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

What is the abbreviation of PTW?

a)

Permit to Work

b)

Permission to work

c)

Planning to work

d)

Possible of work

2.

One of the important roles of PTW Systems are to prevent accidents that may lead to harm to PEAR. What is the abbreviation of PEAR?

a)

People, Engagement, Asset, Recognition

b)

People, Environment, Asset, Reputation

c)

Population, Environment, Asset, Reputation

d)

People, Engagement, Acknowledgement, Reputation

3.

Which of the following is NOT included in the elements of PTW Systems?

a)

Permit title

b)

Permit number

c)

Hazard Identification

d)

Safety Observation system

4.

Welding job would require what type pf permit to work?

a)

Cold work

b)

Hot work

c)

Live work

d)

Working at height

5.

Which of the following personnel involved in the PTW System?

a)

OIM

b)

Affected Area Authority

c)

HSE Supervisor

d)

All of the above

6.

Who is the person who issued the PTW?

a)

HSE Supervisor

b)

Work Crew

c)

Permit Originator

d)

Issuing Authority

7.

Which of the following is the role of Permit Originator?

a)

Responsible for carrying the work

b)

Be competent and trained in issuing permit

c)

To ensure copy of PTW is displayed in central location

d)

Be in control of the working conditions and potential hazards

8.

What is the fifth steps under Processes of PTW System?

a)

Plan Work Scope

b)

Implement Controls

c)

Issue Permit

d)

Pre-Job Discussion

9.

"Go on site and verify hazards identified are correct". This process is listed under which steps of PTW System?

a)

Plan Work Scope

b)

Implement Controls

c)

Review & Verify Controls in the Field

d)

Issue Permit

10.

"Toolbox talk has to be conducted". This process is listed under which steps of PTW System?

a)

Pre-job discussion

b)

Execute & Supervise

c)

Implement Controls

d)

Identify hazards & Define Controls