Time, budget, and use of specific materials are almost always considered to be ________________.
Trade-offs
Criteria
Constraints
Efficiency
Which of the constraints listed below would be considered a physical design constraint?
Demand for product
Timeline
Cost
Materials
Limitations or Must have components of a design or project are called...
Criteria
Constraints
Trade off
Research
Problem Statement
"The distance an electric vehicle can travel on a single charge" is an example of a
Criteria
Constraint
Trade-off
Research
Problem Statement
"The thickness of a laptop computer" is an example of...
Criteria
Constraints
Trade off
Research
Problem Statement
"The next model for a product must be in production in three months" is an example of a...
Criteria
Constraint
Trade off
Research
Problem Statement
A speedboat is not permitted to go faster than 100 knots in a lake. Therefore, the company decides to redesign the throttle so it cannot exceed 95 knots. This is an example of:
constraint.
criteria.
trade-off.
design challenge.
A design challenge is given that says, create a birdhouse, but do not let it cost more than $20.00 in materials. The cost of the birdhouse would be considered a/an:
criterion.
constraint.
requirement.
example.
What is the First Step of the Engineering Design Process
Testing Solutions
Designing Solutions
Identifying or Ask about the Problem to be solved
Planning Solutions
What two things determine the best solution/design to an engineering problem?
If it meets all the constraints
If it looks cool
If it solves a problem
If it ranks the highest in the design criteria
An engineer has designed and built a prototype to improve the brake system of a car. What is the next step that the engineer should take in the process?
Test the prototype and analyze the results.
Make sketches of the prototype.
Identify criteria for the prototype.
During which step of the Design Process do you experiment with the prototype under controlled conditions and collect /record data?
Test the Model
Construct a Model
Identify Failure Points
Reflect and Redesign