1.

S.I. No. 209 has replaced the Seveso II Directive (96/82/EC), S.I. No. 208 regulations and came into effect from?

a)

1st June 2015

b)

1st July 2016

c)

1st of August 2014

d)

1st of May 2019

2.

The Seveso II Directive (96/82/EC), S.I. No. 208 of 2015 was replaced by?

a)

S.I. No. 209 of 2015

b)

S.I No. 209 2019

c)

S.I. No. 208 of 2016

d)

S.I. No. 208 of 2017

3.

What prompted the adoption of legislation on the prevention and control of major industrial accidents involving dangerous substances?

a)

Seveso in 1976

b)

Seveso in 1986

c)

COMAH in 2015

4.

Depending on the quantities or types of goods being stored or manufactured on site Under sites are designated as either?

a)

Upper tier or lower tier sites

b)

Upper class or lower class sites

c)

Category 1 tier or Category 2 tier sites

5.

Who is identified as the Central Competent Authority (CCA)under regulation 4 of the COHAH regulations

a)

HSA

b)

HSE

c)

EPA

6.

Who is responsible for the external emergency planning for incidents, which might potentially occur on a Seveso site?

a)

Local Competent Authorities

b)

The site owner

c)

The site occupier

d)

The EPA

7.

Who are the Local Competent Authorities?

a)

Gardai

b)

HSE

c)

Local Authority

d)

All of the above

8.

In compliance with these regulations and due to the nature of the risks involved who act as the lead agency for all Seveso planning within Dublin?

a)

DFB

b)

HSE

c)

DCC

d)

EPA

9.

DFB lead interagency External Emergency Plan (EEP) development, reviews and exercises at a number of Seveso sites under what regulation of the COMAH regs?

a)

17

b)

18

c)

19

d)

15

10.

DFB develops and presents Seveso Annual Reports to the Health and Safety Authority (HSA). This is done so on behalf of?

a)

All Local Competent Authorities

b)

The EPA

c)

The HSE

11.

Part 1 of the COMAH Regs 2015 relates to?

a)

Preliminary and General

b)

General Duties

c)

Major Accident Prevention Policy and Safety Report

d)

Emergency Plans for Upper Tier Establishments

12.

Part 2 of the COMAH Regs 2015 relates to?

a)

General Duties

b)

Preliminary and General

c)

Major Accident Prevention Policy and Safety Report

d)

Emergency Plans for Upper Tier Establishments

13.

Part 3 of the COMAH Regs 2015 relates to?

a)

Major Accident Prevention Policy and Safety Report

b)

General Duties

c)

Emergency Plans for Upper Tier Establishments

d)

Preliminary and General

14.

Part 4 of the COMAH Regs 2015 relates to?

a)

Emergency Plans for Upper Tier Establishments

b)

Major Accident Prevention Policy and Safety Report

c)

General Duties

d)

Preliminary and General

15.

Regulation 1 of the COMAH regs is?

a)

Citation

b)

Interpretation

c)

Application

16.

Regulation 2 of the COMAH regs is?

a)

Interpretation

b)

Citation

c)

Application

17.

Regulation 3 of the COMAH regs is?

a)

Application

b)

Interpretation

c)

Citation

18.

Regulation 4 of the COMAH regs is?

a)

Establishment of the competent authorities

b)

Commencement

c)

Amendments

19.

Regulation 5 of the COMAH regs is?

a)

Commencements

b)

Amendments

c)

Establishment of competent authorities

20.

Regulation 6 of the COMAH regs is?

a)

Amendments

b)

Commencement

c)

Establishment of competent authorities

21.

Regulation 7 of the COMAH regs is?

a)

General duties of operators

b)

Amendments

c)

Domino effect

22.

Regulation 8 of the COMAH regs is?

a)

Notifications

b)

General duties of operators

c)

Domino effects

23.

Regulation 9 of the COMAH regs is?

a)

Domino effects

b)

General duties of operators

c)

Notification

24.

Regulation 10 of the COMAH regs is?

a)

Major accident prevention policy

b)

Safety report

c)

Modification of installation, establishment or storage facility

25.

Regulation 11 of the COMAH regs is?

a)

Safety report

b)

Modification of installation, establishment or storage facility

c)

Major accident prevention policy

26.

Regulation 12 of the COMAH regs is?

a)

Modification of installation, establishment or storage facility

b)

Major accident prevention policy

c)

Safety report

27.

Regulation 13 of the COMAH regs is?

a)

Objectives of Emergency plans

b)

Implementation of Emergency plans

c)

Internal Emergency Plans

28.

Regulation 14 or the COMAH regs is?

a)

Implementation of Emergency plans

b)

Objectives of Emergency plans

c)

Internal Emergency Plans

29.

Regulation 15 of the COMAH regs is?

a)

Internal Emergency Plans

b)

External Emergency Plans

c)

Objectives of Emergency plans

30.

Regulation 16 of the COMAH regs is?

a)

External Emergency Plans

b)

Internal Emergency Plans

c)

Objectives of Emergency plans

31.

Regulation 17 of the COMAH regs is?

a)

Review, testing and reporting of external Emergency Plans

b)

External Emergency Plans

c)

Objectives of Emergency plans

32.

Under COMAH Regulations 2015 Part 4, Regulation 16, External Emergency Plans, who is required to supply all necessary information and to whom is it supplied?

a)

The operator of the establishment to the LCA

b)

The LCA to the HSA

c)

The operator of the establishment to the HSA

33.

According to regulation 17 External Emergency Plans have to be reviewed and, where necessary, updated as often as the circumstances require, but in any event at intervals not exceeding?

a)

3 years

b)

5 years

c)

10 years

34.

According to regulation 11, the operator of an establishment is required to prepare and submit a safety report, in writing, to whom?

a)

Central Competent Authority

b)

Local Competent Authority

c)

HSA

35.

According to regulation 10, the preparation of a Major Accident Prevention Policy document (MAPP) only applies to Upper Tier establishments

a)

False

b)

True

36.

According to regulation 9 a Domino effect is described as?

a)

A group of establishments where risk is increased because of the geographical position and the proximity

b)

Where risk is increased because of the location of a group materials stored at an establishment

c)

A group of establishments where risk is increased because of the environmental / weather conditions

37.

According to regulation 7, duties imposed on all operators applies to all establishments and there is no differentiation between the operators of upper-tier and lower-tier establishments

a)

True

b)

False

38.

The COMAH Regulations do not apply to; (Choose 4)

a)

Any property occupied by the Defence Forces

b)

Hazards created by ionising radiation originating from substances

c)

The transport of dangerous substances and directly related intermediate temporary storage by road, rail, internal waterways, sea or air

d)

The offshore exploration and exploitation of minerals. Waste land-fill sites, including underground waste storage

e)

Onshore underground gas storage in natural strata, aquifers, salt cavities and disused mines and chemical and thermal processing operations

39.

What makes a lower tier establishment become an upper tier establishment?

a)

Dangerous substances are present in quantities equal to or in excess of the quantities listed in Column 3 of Part 1 or in Column 3 of Part 2 of Schedule 1

b)

The establishment covers a greater area in excess of the quantities listed in Column 3 of Part 1 or in Column 3 of Part 2 of Schedule 1

c)

The establishment is in proximities to other establishments in excess of the quantities listed in Column 3 of Part 1 or in Column 3 of Part 2 of Schedule 1

40.

According to regulation 17, External Emergency Plans must be tested at a maximum interval of?

a)

3 years

b)

1 year

c)

2 years

d)

5 years

41.

Who undertakes the public consultation process which is part of the SEVSO III / COMAH Regulations in conjunction with other LCA's?

a)

DFB

b)

EPA

c)

HSA

d)

Gardai

42.

In the first quarter of the year LCA's present SEVESO Annual Reports to the CCA. These must be completed by? (DFB in the case of Dublin)

a)

February 28th

b)

March 28th

c)

April 28th

d)

March 1st

43.

Under Regulation 16 an LCA must produce an External Emergency Plan upon receipt of relevant information from the site operator. This must be done within?

a)

6 months from receipt of info from site occupier

b)

12 months from requirement notification from CCA

c)

12 months from receipt of info from site occupier

d)

2 years from requirement notification from CCA

44.

LCA's must submit a report to the CCA on their activities under regs 16 and 17 within how long before the calendar end?

a)

2 months

b)

1 month

c)

3 months

d)

2 weeks

45.

The purpose of the COMAH regulations is to lay down the rules for the prevention of major accidents involving dangerous substances and to seek to limit the consequences to;

a)

Human health and the environment

b)

The site and surrounding buildings

c)

The environment and water courses

d)

Life and property