Font size
WorksheetsYear 11 GAIT term 3 week 8
Total questions: 130
Worksheet time: 2hrs 30mins
How Many GBs does a Terabyte have?
1024
8
100
1
What is the smallest measurement used to measure a computer memory ?
Megabyte
Terabyte
Yottabyte
Bits
What are the types of Computer Memory ?
Primary memory and Secondary memory
Non of these
Primary memory
Secondary memory
What are the types of of Primary memory
RAM and ROM
RAM
ROM
CD
What is an example for a secondary memory ?
RAM
ROM
Pen Drive
Charger
What is the full form of RAM
Read only memory
Random Access Memory
Radom Access memory
non of these
What is the full form of ROM
Read only Memory
Read or write memory
non of these
Ram is a Temporary Memory
True
False
A secondary memory can also be called as
Backup Memory
Main memory
Internal memory
Any part of the computer with a physical structure, including the parts inside.
hardware
software
screen
computer tower
What is this hardware component?
RAM
Hard Drive
USB
Ethernet
A computers long term memory is stored on the __________.
Random access memory
CPU
Motherboard
Hard Drive
What is this hardware component?
motherboard
CPU
power supply
graphics card
The brain of the computer that processes info and carries out commands.
motherboard
RAM
hard drive
CPU
What hardware component is this?
CPU
motherboard
RAM
Remote Access Memory
The main circuit board that holds and connects main parts of the computer
CPU
RAM
Ethernet
Motherboard
Name these ports.
SSD
USB
RAM
VGA
This port is used to connect.....
The mouse
The keyboard
The Monitor
The printer
The blue cord that connects computers to display devices
HDMI
VDI
DMI
VGA
This cord connects the....
monitor to the computer
computer to the internet
printer to the computer
mouse to the computer
This hardware component is called?
the printer
the monitor
the tv
the CPU
This port is used to connect the computer to the.....
printer
monitor
internet
keyboard
A computers short term memory used to complete calculations
hard drive
cloud storage
RAM
disc drive
You would plug the power cord into port number....
3
6
7
12
You would plug the VGA connector into port number
3
8
10
11
You would plug the ethernet cord into port number...
3
4
7
8
You would plug the mouse into port number....
3
7
8
11
Which of the following would NOT be plugged into a USB port?
printer
mouse
monitor
keyboard
Which of the following is NOT a hardware component for a computer?
mouse
motherboard
Microsoft Word
CPU
CPU
Mouse
The scope is the foundation of:
Your cost estimate and the project schedule
Scope creep
Client communication
The building and testing phase
Which of the following are NOT part of a project plan?
Schedule and due dates
Project scope and tasks
Costs and resource allocation
Scope creep and change requests
The project scope establishes which boundaries for the client?
Deadlines and due dates
Resource allocation limits
Budget and cost limits
Tasks that are and are not included
What size of design firm should use project management techniques?
All sizes: large firms need specialized software, but even a staff of one can benefit
The huge star designer firms in New York and other big cities
Firms of any size, but only when they work on large, complex projects
Firms with more than five designers on staff
How are project costs calculated?
By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources
By adding up the costs of all materials
By a calculation so complicated only a computer could do it
By multiplying the human resources by the material resources
During the design phase and the building and testing phase, how can milestone client reviews help your design project?
You get client signoff on the final project.
You get client feedback on your designs and clear up any misunderstandings.
You can ask the client for a contract for his next project, too.
You can tell exactly where the client is completely wrong.
What are the four typical phases in a project?
Planning and analysis phase; design phase; building phase; implementation or publishing phase
Planning phase; analysis phase; design phase; building and testing phase
Planning phase; analysis phase; testing phase; implementation phase
Planning and analysis phase; design phase; building and testing phase; implementation or publishing phase
During which phase are the systems set up for monitoring the three main elements of the project plan (scope, schedule, and costs)?
Building and testing phase
Implementation or publishing phase
Design phase
Planning and analysis phase
What role does analysis play in the planning and analysis phase?
Figuring out the best way to get the project done
How to handle scope creep
How to get from point A to point B
How to handle a challenging client
During which phase of a project is the project plan most closely monitored?
Design phase
Planning and analysis phase
Implementation or publishing phase
Building and testing phase
How can you tell if a project is veering off course?
Use your intuition.
Schedule peer and client reviews.
Ask the team leaders how their work is going.
Monitor closely, during the building and testing phase, the project scope, schedule, and costs.
Why can most design work be considered projects?
It's visual and unique.
It's cutting-edge and unique.
It's temporary and unique.
It's temporary and beautiful.
What are two common problems in project management?
Internal staff conflict and unattainable deadlines
Scope creep and mismatch of methods to the project or the client
Lack of funds and human resources
Lack of client communication and product testing
During which project management phase is client communication key?
Design phase
Planning and analysis phase
Building and testing phase
All phases
Uncontrolled addition of technical features to a system :
Scope creep
Constraints
Interruptions
Feature creep
Who are the stakeholders in a project?
Those who are sponsoring your project and provide its resources
Those who will be affected by the project's outcome and are involved at specific stages
The people who carry out your delegated tasks throughout the project's duration
Those who have expertise in specific areas and provide you with advice where necessary
The scope is the foundation of:
Your cost estimate and the project schedule
Scope creep
Client communication
The building and testing phase
What are the four typical phases in a project?
Planning and analysis phase; design phase; building phase; implementation or publishing phase
Planning phase; analysis phase; design phase; building and testing phase
Planning phase; analysis phase; testing phase; implementation phase
Planning and analysis phase; design phase; building and testing phase; implementation or publishing phase
What role does analysis play in the planning and analysis phase?
Figuring out the best way to get the project done
How to handle scope creep
How to get from Point A to point B
How to handle a challenging client
What am I? I am the things you need to be able to complete a task or activity
Deadlines
Durations
Resources
Timescales
In ___________ stage, the multimedia team will identify criteria for specific target user.
planning
designing
testing
delivering
The second stage of multimedia development is ___________.
Idea Analysis
Testing
Development
Implementation
A series of graphics that outline the visual details of a multimedia project is called:
a storyboard
a pictogram
an icon
a composite
Which of these images shows a Storyboard?
What is the purpose of a storyboard?
A storyboard is a way for you to complete your work.
Use a storyboard to set up all of your ideas before starting your project.
A storyboard is the same as a whiteboard
A storyboard can only be used for research
Choose testing used in multimedia
Gamma Testing
Alpha Testing
User Testing
Beta Testing
Identify basic stage of multimedia project development.
Planning, Development, Testing, Documentation, Implementation
Implementation, Development, Documentation, Planning, Testing
Planning, Development, Testing, Implementation, Documentation
Development, Planning, Testing, Implementation, Documentation
The final stage of the project life cycle is..
Initiation
Planning
Execution
Evaluation
A SWOT analysis identifies...
Something Which Otherwise Threatens
Strengths Weaknesses Opposition Threats
Strengths Weaknesses Opportunities Threats
Separations Weaknesses Oppositions Threats
Which project management tool gives a graphic representation of the project's timeline?
Stakeholder matrix
RACI matric
Critical Path Analysis
Gantt chart
The third stage of the project life cycle is...
Closure and evaluation
Execution
Planning
Initiation
Which of the following is considered malware?
spyware
anti-virus software
open source software
Apps
You computer is running slow and you are having trouble connecting to websites. What should you do?
Check power source and internet cables
Check internet cables and network connections, and do a virus scan
Check power cords, internet connections, and do a virus scan
Check power cords, all cables going in and out of the computer, check internet connections, check network connections, do a virus scan and restart.
You can't get on your school's network(not internet). What should you check first?
Your cable company
cables going into and out of your computer
your internet connection
cable connected to your monitor
this picture means?
the computer does not give out a sound
the sound is to loud
do talking in the classroom
Why is it important to have antivirus software installed on your computer?
To track your finances
To stop others from plagiarizing your work
to prevent others from stealing your device
To stop hackers from harming your computer
