Worksheets

Chapter 4- Defining the Project

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

is a significant event in a project that occurs at a point in time.

(a)  

2.

SOW

a)

Statement of Work

b)

System of Work

c)

Scope of Work

d)

Summary of Works

e)

Scheme of Work

3.

is the tendency for the project scope to expand over time

(a)  

4.

WBS

a)

Work Breakdown Structure

b)

Write Back Soon

c)

Whole Body Scan

d)

Work Breakdown Schedule

5.

The lowest level of the WBS is called a (a)  

6.

depicts how the firm has organized to discharge work responsibility

(a)  

7.

The first step in creating the necessary information to manage a project is to

a)

Establish project priorities

b)

Define the project scope

c)

Verify the budget available

d)

Determine the required completion date

8.

Which of the following is not one of the items that would appear on a project scope checklist?

a)

Deliverables

b)

Technical requirements

c)

Objectives

d)

Work breakdown structure

9.

If a project criterion should be optimized if at all possible, it is classified as being constrained.

a)

TRUE

b)

FALSE

10.

What is a Responsibility Matrix and how would it be used in project management?