wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

iSAD - Q1

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

1. He/She is an information technology professional who specializes in analyzing, designing and implementing information systems

a)

Information Systems personnel

b)

Systems Analyst

c)

Accountancy and Information Systems personnel

d)

System Administrator

2.

2. It is the phase that collects data from the present system and analyze the new requirements.

a)

Preliminary Investigation

b)

System Analysis

c)

System Design

d)

System Analyst

3.

3. This phase determines the need for New information System

a)

Preliminary Investigation

b)

System Analysis

c)

System Design

d)

System Maintenance

4.

4. It is the most crucial phase in the development of a system

a)

System Maintenance

b)

System Analysis

c)

System Design

d)

System Investigation

5.

5. It is an integrated set of components for collecting, storing, and processing data and for providing information and digital products.

a)

Accounting Information

b)

Information Design

c)

Information Analysis

d)

Information System

6.

6. It refers to the process of examining a business situation with the intent of improving it through better procedures and methods.

a)

System Integration

b)

System Analysis and Design

c)

Business Analysis

d)

Business Methods

7.

7. (Choose all that apply)

What are the three 3 main task of Preliminary Investigation.

a)

Identify the problem

b)

Research and Development

c)

Suggest alternative system

d)

Prepare a short report

8.

8. It is an illustrations or symbol or a way of displaying how data flows in a system and how decisions are made to control events.

a)

System flowcharts

b)

Illustrator

c)

System Analysis

d)

System Design

9.

9. This phase is where you teach people on how to operate the new system

a)

Preliminary Investigation

b)

System Design

c)

System Analysis

d)

System Implementation

10.

10. This phase is necessary to eliminate errors in the system during its live operation.

a)

System Maintenance

b)

Preliminary Investigation

c)

System Implementation

d)

System Analysis