WorksheetsTraffic Management Plan
Total questions: 10
Worksheet time: 3mins
What is a construction traffic management plan?
A plan to control what types of cars are allowed on a building site
A plan to control what type of plant machinery can be on a building site
A plan to reduce the risk of traffic accidents on a building site
A plan to stop plant machinery running out of diesel
Which of the following best fits the description of a traffic management plan?
Keeping pedestrians and the public together
Keeping the construction workers safe
Keeping pedestrians and site traffic apart
Keeping excavations to a minimum
Which of the following is in a construction site traffic management plan?
The location of the canteen
Correct deployment of toilets
Correct deployment of entrances and exits
Correct deployment of materials and equipment
How should construction site entrances and exits be deployed?
So that the greatest possible views are available
To remove any obstructions around them
So that the can easily be locked
So that they are safe to navigate
Which one of the following helps to control pedestrians and traffic?
A dumper
A skip
Crossings
Walkways
Which of the following is an important principle of construction site traffic management?
Good visibility
Good welfare facilities
Good traffic control
Good walkways
Identify a control measure for reducing the risk of construction traffic accident.
Place security guards around the office
Remove all rubbish from the skip
Remove cladding from the walls
Remove any obstructions
What do obstructions do?
Provide light
Provide ventilation
Prohibit work
Prohibit views
Which of the following help to keep pedestrians and site traffic separate?
Skip
Canteen
Barriers
Fencing
Identify a way to keep pedestrians and site traffic apart.
Walkways
Canteens
Site offices
Hi vis jackets