Brickwork Setting Out Level 2 NEW 1

Total questions: 33

Worksheet time: 11mins

Name
Class
Date
1.

What is the mathmatical formula called used to set out a corner?

a)

1:2;3;

b)

2;3;4

c)

3:4;5:

d)

4:5:6:

2.

What piece of equipment would you use to set out a corner with?

a)

a level

b)

a trowel

c)

a straight edge

d)

a builders square

3.

What is a quoin?

a)

a new penny

b)

the top of the wall

c)

the foundation

d)

the corner of the building

4.

What can you put your dimensions onto to make sure that they are accurate when setting out?

a)

a tape

b)

a profile board

c)

a stake

d)

a straight edge

5.

Why are profile boards set back from the trench?

a)

easier to clean

b)

easier to put your measurments on them

c)

so they dont get damaged by the digger

d)

so you can paint them

6.

You need a drawing that will show you the surrounding area and a plan view of the site which one should you use?

a)

Elevation drawing

b)

Block drawing

c)

Sectional drawing

d)

Site drawing

7.

What would you use to work out measurments on a working drawing?

a)

Tape measure

b)

Pencil and rule

c)

Compass

d)

Scale rule

8.

What would give you an overall levelling point to work from?

a)

To work out your drawings with.

b)

Used to lay bricks and blocks

c)

The site datum

d)

Used to set out your corners.

9.

What does R.W.P. mean?

a)

Right Working Person

b)

Rain Water Pipe

c)

Right Way Pointing

d)

Run Water Please

10.

What record would you use to locate services?

a)

A Cliff Richard record

b)

Building plan records

c)

Detail drawing records

d)

Local authority records

11.

What welfare facilities must be on a building site when you have 5 workers?

a)

Canteen and toliet

b)

Drying room and toilets

c)

Hot and cold tea

d)

Toilets and smoking shelter

12.

Before you start work on a new construction site what must you do first?

a)

Have a cup of tea and dicuss it

b)

Remove all vegetation

c)

Check the drawings

d)

Meet with local authority

13.

What should you do to the work area first to make sure it is safe to work in?

a)

Plan out for car parking

b)

Locate existing drain services

c)

Locate where the nearest eletric point is

d)

Plan where to put site offices

14.

What would you find on a title panel on a drawing?

a)

Site address

b)

Scales used

c)

Client's name

d)

All of the above

15.

What should a method statement show you when setting out for new services?

a)

New drawings to use

b)

A safe sequence of isolating existing services

c)

The specifations and how to follow them

d)

Which Building regulations to follow

16.

What scales are used for a block plan?

a)

1:50

b)

1:1000

c)

1:20

d)

1:1250

17.

If you think the drawing is wrong and you saw an inaccuracy on the drawing what would YOU do?

a)

Nothing it must be correct because came in an envelope

b)

Speak to the Building inspector

c)

Speak to your supervisor

d)

Speak with your mate

18.

Before you set out on a new site why must you clear it first?

a)

To show where the canteen is going

b)

To show where the toilets are going

c)

To remove any obstacles

d)

To show where the road is going

19.

Where does the site datum get transferred to once you set out?

a)

The building line

b)

The corners of the building

c)

The roof height

d)

The window height

20.

Once you have set out and transferred your measurements to the profile boards WHY must they be protected?

a)

So you know where they are

b)

To stop them falling into the tench

c)

So you dont damge them when digging out

d)

To prevent any inaccuracies in the measurements

21.

What do you do to check an optical level is working ok?

a)

Carry it correctly in the box

b)

Get it checked by the building inspector

c)

Get it checked by the manufacture’s calibration

d)

Use it with a builders square

22.

When you set out what was the importance of the building line?

a)

It showed you face brickwork

b)

It shows how close you can be to the Highway

c)

It show how big the building can be

d)

It shows the building is square

23.

Before you use an optical square what must you do first?

a)

Read the manufactures instructions

b)

Check with your supervisor

c)

Ask Dave

d)

Check ALL the pieces are there

24.

Why do you use temporary profiles boards when setting out?

a)

To show where the digging needs to be done

b)

To show where the brickwork is going

c)

To check the dimensions are correct

d)

Easier to remove

25.

What are you going to use to transfer your information from the datum to the foundation?

a)

Gauge rod

b)

Storey rod

c)

Tape measure

d)

Spirit level

26.

What is the perimeter of a building?

a)

The roof

b)

The front of the building

c)

Two side's of the building

d)

All the way round the outside of the building

27.

How do you measure the perimeter of a building

a)

2L x 2W

b)

2L + 2W

c)

1L + 3W

d)

3L + 1W

28.

What does an Isometric projection on a drawing show you?

a)

A plan view

b)

An elevation view

c)

A 3D view

d)

A 2D view

29.

What does a sectional drawing show you?

a)

Plan view

b)

Elevation view

c)

3D view

d)

Drawing detail cut through an object

30.

What is Greenfield land?

a)

Land that cannot be built on

b)

Land than can be built on

c)

Land that grass grows there only

d)

Land that is in Greenland

31.

What is Brownfield land

a)

Land you cannot build on

b)

Land you can build on

c)

Land with mud on it only

d)

Land which has been burnt

32.

What main tool will help you set out a Quoin?

a)

A builders square

b)

A level

c)

A set of lines

d)

A hammer and bolster

33.

What piece of equipment would you need to transfer levels across a site?

a)

Optical level

b)

Builders square

c)

Spirit level

d)

Lines and pins