wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Project Scope Management

Total questions: 15

Worksheet time: 4hrs 45mins

Name
Class
Date
1.

What is the difference between a Scope Management Plan and a Requirement Management Plan

(a)  

2.

What is the difference between Requirements Documentation and Requirements Traceability Matrix

(a)  

3.

What does WBS Dictionary mean?

(a)  

4.

What are the objectives of the Validate Scope . process?

(a)  

5.

What is the difference between Verified Deliverables and Accepted Deliverables

(a)  

6.

What does Scope Baseline mean?

(a)  

7.

Which one of the following mostly includes the product acceptance criteria that outline requirements a project must meet before stakeholders accept the final product or service?

a)

Quality Management Plan

b)

Scope Management Plan

c)

Project Scope Statement

d)

Requirements Management Plan

8.

Product scope describes the features, functions, and physical characteristics that characterize a product, service, or result. Completion of the product scope is measured against which one of the following?

a)

Scope statement

b)

Project objectives

c)

Project requirements

d)

Product requirements

9.

Walkthroughs, reviews, product reviews, and audits are examples of which one of the following methods of examining work or a product to determine whether it conforms to documented standards or not?

a)

Observation

b)

Inspection

c)

Verification

d)

Decision Making Techniques

10.

Verified deliverables are inputs in which of the following scope management processes?

a)

Define Scope

b)

Validate Scope

c)

Create WBS

d)

Control Scope

11.

Which one of the following are the unapproved and undocumented changes and what occurs when changes to the scope are not detected early enough or are not managed?

a)

Scope baseline

b)

Scope creeps

c)

Residual risks

d)

Variances

12.

Which one of the following mostly includes the product acceptance criteria that outline requirements a project must meet before stakeholders accept the final product or service?

a)

Quality Management Plan

b)

Scope Management Plan

c)

Project Scope Statement

d)

Requirements Management Plan

13.

All of the following are true regarding the Control Scope process EXCEPT:

a)

It assures that underlying causes of all requested changes and recommended corrective actions are understood and processed through the Integrated Change Control process.

b)

One of the key focuses in the process may be dispute resolution related to project scope

c)

It monitors the status of the project and product scope, maintains control over the project by preventing overwhelming scope change requests, and manages changes to the scope baseline.

d)

It verifies the correctness of work results

14.

The sponsor has recently assigned you as a project manager to design and develop a custom video conferencing tool. As per the sponsor, the project must be completed in four months and should integrate with the existing infrastructure and applications in the organization. This is an example of which of the following

a)

Constraints

b)

Expert judgment

c)

Assumptions

d)

High-level planning

15.

Explain the difference between Product Scope and Project Scope

(a)