Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ROAD SLOPE PROTECTION AND BRIDGE REPAIR

Total questions: 7

Worksheet time: 2mins

Name
Class
Date
1.

What does "BMS" stands for?

a)

Bridges Management System

b)

Basic Management System

c)

Bridge Manager System

d)

Bridge Management System

2.

It is the official procedure or system to monitor the condition of bridges on national roads and to develop programs for the major maintenance, upgrading, and replacement of bridges requiring intervention to provide the required level of service.

a)

RSMS

b)

RBIA

c)

BMS

d)

RTIA

3.

Based on DO 43 s.2008, "All data for the operation of the BMS shall be stored in the ________ (RBIA) in accordance with RBIA requirements."

a)

Road and Bridge Inventory Application

b)

Road and Bridge Information

Application

c)

Roads and Bridges Inventory Application

d)

Roads and Bridges Information

Application

4.

The pilot project on road slope in Region X is situated in what municipality?

a)

Manolo Fortich

b)

Kulaman

c)

Sumilao

d)

Lantapan

5.

_________ is performed to restore small areas

where sound concrete is damaged by spalling,

scaling and impact. The patch thickness is limited

to a maximum of 100 mm depth of hollow surface.

a)

Caulking

b)

Patch Repair

c)

Carbon Fiber Sheet Bonding

d)

Epoxy Injection

6.

It is recommended as preventive maintenance, made from

polymer cement with lithium nitrate, which is effective against chloride ions especially if the bridge is located less than 1 kilometer from coastal area.

a)

Protective Coating

b)

Steel Plate Bonding

c)

Protective Mortar

d)

Patching

7.

It is applied to protect the deteriorated concrete due to corrosion of rebars, damage due to rapid water flow or broken due to continuous impact from materials flowing in the channel such as driftwoods.

a)

Concrete Jackket

b)

Concrete Mortar

c)

Concrete Epoxy

d)

Concrete Jacket