wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Q-Storm

Total questions: 25

Worksheet time: 8mins

Name
Class
Date
1.

2. CMMI contains---------------maturity levels

a)

3

b)

4

c)

5

2.

Which Practice Area relates to Internal Audit?

a)

Process Quality Assurance

b)

Peer Review, Process Quality Assurance, Supplier Quality Assurance

c)

Supplier Quality Assurance, Process Quality Assurance, Process and Product Quality Assurance

3.

What are the categories in CMMI 2.0?

a)

Managing work force, Planning and managing work

b)

Insuring quality, Delivering Services

c)

Improving, Enabling, Managing, Doing

4.

What does the acronym SEPG stand for?

a)

Software Engineering Practice Group

b)

Software Executive Process Group

c)

Software Engineering Process Group

5.

CMMI -Dev Stands for

a)

Development

b)

Testing

c)

Division

d)

Deployment

6.

When is root cause analysis required?

a)

To address nonconformities identified during audits

b)

For failing a test

c)

None of the above

d)

Both a & b

7.

Under which Category is Causal Analysis and Resolution?

a)

Doing

b)

Managing

c)

Enabling

8.

CAR requires the identification and address of causes of selected ________?

a)

Products

b)

Outcomes

c)

 Processes

9.

Which Practice Area contains the practice for determining performance improvement needs?

a)

Governance (GOV)

b)

Managing Performance and Measurement (MPM)

c)

Process quality Assurance (PQA)

10.

Which level has minimal organizational planning

a)

Level 3

b)

Level 2

c)

Level 1

11.

Which of the following is a requirement management activity?

a)

Investigation

b)

Development and Test

c)

Design

d)

All the above

12.

Requirement Development Management (RDM) Practice area shall comply by

a)

BA

b)

 Developer

c)

Tester

13.

The identification of peer reviews (PR) has relationship to defects found in what other Practice areas

a)

Defect Analysis (DA)

b)

Verification and validation (VV)

c)

Causal Analysis Resolution (CAR)

14.

Identify the changes between CMMI V 2.0 model structure as compared to CMMI V1.3 model structure

a)

Elimination of Goals

b)

Process areas are now called Practice areas to be accurate

c)

both a and b

15.

Are we building the product right? This statement refers to....

a)

Validation

b)

Verification

16.

Which Practice Area is related to Testers?

a)

Peer Review

b)

Verification and Validation

c)

Monitor and Control

17.

What practice area is about controlling and maintaining the integrity of work products?

a)

Product Integration

b)

Configuration Management

c)

Verification and Validation

18.

Which Practice Area talks about the training programs conducted in organization?

a)

Governance

b)

Organizational Training

c)

 Planning

19.

While saving your work which practice area should be thought of

a)

Configuration identification

b)

Configuration Management

c)

Configuration Control

20.

Which Practice Area talks about Identify and Resolve Issues?

a)

Causal Analysis Resolution

b)

Monitoring and Control

c)

 Decision Analysis Resolution

21.

What is the full name of the RISK Practice Area?

a)

Risk and Release Management

b)

Risk and Opportunity Management

c)

Risk Management

22.

Which PA addresses the need to prepare for the knowledge and skills needed to perform the work?

a)

Planning

b)

Managing performance and Measurement

c)

Monitoring and Control

23.

Which Practice area is specific to Level 2

a)

Configuration Management

b)

Causal Analysis Resolution

c)

 Estimation

24.

Expand CMMI

a)

Capability Model Maturity Integration

b)

Capability Maturity Model Integration

c)

Capacity Maturity Model Integration

25.

How Many categories are there in CMMI V 2.0

a)

2

b)

3

c)

4

d)

5