wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Kaizen

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

Kaizen is Japanese Term in which “Kai” refers to .....

a)

Good

b)

Change

c)

Improve

d)

None of Above

2.

…………is a Kaizen activity

a)

Implementing pre-determined plan for change

b)

Developing solution to problem in terminal

c)

Streamlining flow of paperwork

d)

All of Above

3.

The Kaizen tool that involves, first-hand observation is

a)

Six Sigma

b)

Gemba

c)

5S

d)

TPM

4.

Kaizen refers to......

a)

Doing Good Things

b)

Continuous Improvement

c)

Start Improvement

d)

Stop Improvement

5.

Which of following is not the aim of Kaizen process?

a)

To Make Process Efficient

b)

To Make Process Effective

c)

To improve Safety Performance

d)

To Make Process Uncontrollable

6.

In the Kaizen Process Improvements are accomplished gradually in small increments?

a)

True

b)

False

7.

Kaizen requires little investment but great efforts to maintain it?

a)

True

b)

False

8.

What does the letter ‘D’ and ‘V’ refer to in the DIVE model?

a)

Data, Verify

b)

Design, Validate

c)

Design, Verify

d)

Define, Verify

9.

Following are Muda except .......

a)

Waiting

b)

Defects

c)

Movement

d)

Transportation

10.

Following are Types of Kaizen Except

a)

Kata Kaizen

b)

Academy Kaizen

c)

Monthly Kaizen

d)

Daily Kaizen